Further Notes On Operation - Siemens SIMATIC S7-CPs Manual

Industrial ethernet
Table of Contents

Advertisement

8 Further Notes on Operation

8.1
Memory reset / reset to factory defaults
The CP has a two-level function available for resetting memory:
S Clear / reset
S Resetting to factory settings
Notice
The functions for resetting and resetting to factory defaults described here do not
change the configuration data on the CPU! Es werden nur die auf dem CP
gehaltenen Daten gelöscht.
If you subsequently upload the configuration data from the CPU to a PG you will
always object the configuration data that were previously on the CP (with
parameters, connections, IP address).
Notice
If you clear/reset a CPU as of version 5.2, the CP memory is also reset if you are
using PROFINET IO.
How to use the functions
You can start the memory reset functions in STEP 7. The CP must be in STOP. If
you are using PROFINET IO mode, the CPU must also be in STOP.
S Clear / reset
In STEP 7/HW Config with PLC
or
In STEP 7 / NCM Diagnostics with Operating Mode
S Resetting to factory settings
In STEP 7 / SIMATIC Manager über den Menübefehl Zielsystem
Ethernet−Teilnehmer bearbeiten...
Werkseinstellungen
or
In STEP 7 / NCM Diagnostics with Operating Mode
Defaults
CP 443-1 for Industrial Ethernet / Manual Part B
Release 07/2010
C79000-G8976-C223−06
8 Further Notes on Operation
Clear/Reset
"
Clear/Reset Module
"
CP auswählen
"
"
Reset to Factory
"
"
"OK"
Rücksetzen auf
"
B−35

Advertisement

Table of Contents
loading

Table of Contents