Install Flue Hood - Carrier Infinity 480CEN024 Installation Instruction

Single-packaged gas furnance, system with 48ce/48cen series puron r-410a refr., single and tree-phase units sizes 024-060
Table of Contents

Advertisement

1
2
n
Y
4
X
Fig. 8 - Corner
Weights
#
3
A0612g
CORNER WEIGHTS (SMALL CABINET)
Unit
024
030
Total Weight
362
362
Corner Weight 1
78
78
Corner Weight 2
78
78
Corner Weight 3
72
72
Corner Weight 4
134
134
036
384
79
89
"$ w
72
,_
144
CORNER WEIGHTS (LARGE CABINET)
Unit
042
048
Total Weight
415
465
Corner Weight 1
91
103
Corner Weight 2
65
77
Corner Weight 3
111
123
Corner Weight 4
148
162
060
515
113
82
138
182
Step 6--Connect
Condensate
Drain
NOTE:
When installing
condensate
drain connection
be sure to
comply
with local codes and restrictions.
Model 48CE
disposes
of condensate
water through
a 3/4 in. NPT
fitting which exits through
the compressor
access panel (See Fig. 5
and 6 for location).
Condensate
water
can be drained
directly
onto the roof in rooftop
installations
(where
permitted)
or onto a gravel
apron in ground
level installations.
Install a field- supplied
2"condensate
trap at end
of condensate
connection
to ensure proper
drainage.
Make sure that
the outlet
of the trap is at least 1 in. lower than
the drain-pan
condensate
connection
to prevent
the pan from overflowing
(See
Fig. 9). Prime the trap with water. When using a gravel apron, make
sure it slopes away from the unit.
Connect
a drain tube - using a minimum
of 3/4-in.
PVC or 3/4-in.
copper pipe (all field-supplied)
- at the outlet end of the 2-in. trap.
Do not undersize
the tube. Pitch the drain tube downward
at a slope
of at least l-in.
for every 10 ft of horizontal
run. Be sure to check
the drain tube for leaks.
1" (25mm)
MIN.
--L
TRAP
["----_,.,_
OUTLET
._
!ii!50mm)
MIN"
C99013
Fig. 9 - Condensate
Trap
Step 7--Install
Flue Hood
CARBON
MONOXIDE
POISONING
HAZARD
Failure to follow this warning
could result in personal
injury
or death.
The venting
system is designed
to ensure proper venting. The
flue hood assembly
mustbe
installed as indicted
in this section
of the unit installation
instructions.
Install the flue hood as follows:
1. This installation
must conform with local building
codes and
with the National
Fuel Gas (;ode (NFGC),
ANSI Z223.1 (in
Canada,
CAN/CGA
B149.1,
and
B149.2)
or NFPA
(National
Fire Protection
Association)
latest revision.
Refer
to Provincial
and local plumbing
or wastewater
codes and
other applicable
local codes.
2. Remove
flue hood from shipping
location
(inside the return
section
of the blower
compartment-See
Fig. 11). Remove
the return duct cover to locate the flue hood. Place flue hood
assembly
over flue panel.
Orient screw holes in flue hood
with holes in the flue panel.
3. Secure flue hood to flue panel by inserting
a single screw on
the right side and the left side of the hood.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents