Carrier Infinity 480CEN024 Installation Instruction
Carrier Infinity 480CEN024 Installation Instruction

Carrier Infinity 480CEN024 Installation Instruction

Single-packaged gas furnance, system with 48ce/48cen series puron r-410a refr., single and tree-phase units sizes 024-060

Advertisement

to the Expertg[
Installation
Instructions
NOTE:
Read
the entire
instruction
manual
before
starting
the
installation.
NOTE:
Installer:
Make
sure the Owner's
Manual
and
Service
Instructions
are left with the unit after installation.
TABLE
OF CONTENTS
Page
SAFETY
CONSIDERATIONS
........................
1
..................................
2
................
2-15
.................................
2
...................................
2
................................
2
..............................
2
.....................................
2
....................................
2
.................................
2
Field Fabricate
Duc_vork
...........................
2
................................
3
................................
3
.....................................
3
...........................
3
Connect
Condensate
Drain
..........................
8
..................................
8
Install Gas Piping
................................
11
Install Duct Connections
...........................
12
Configuring
Units for Downflow
(Vertical)
Discharge
....................................
12
Install Electrical
Connections
.......................
12
Transfornmr
Protection
..........................
13
High- Voltage Connections
.......................
13
Special
Procedures
for 208-V
Operation
.............
14
Control
Voltage Connections
......................
14
Optional
Accessories
..............................
14
Outdoor
Air Thermistor
(OAT)
....................
14
Humidifier
Connections
.........................
15
Electronic
Air Cleaner
...........................
15
PRE-START-UP
...............................
15-16
START-UP
AND TROUBLESHOOTING
...........
16-20
Check for Refrigerant
Leaks
........................
16
Unit Start-Up
...................................
16
LED Description
...............................
16
Control
Start-Up
...............................
16
ECM Motor Troubleshooting
.....................
17
Verify Motor
Winding
Section
....................
17
Motor Turns Slowly
............................
17
Sequence
of Operation
............................
17
Gas Heat Mode
and Adjustments
..................
17
Check Gas Input
...............................
17
Adjust Gas Input
...............................
18
Check Burner
Flanm
............................
18
Airflow
and Temperature
Rise .....................
18
Limit Switches
................................
19
Rollout
Switch
................................
19
Cooling
Mode
.................................
19
Checking
and Adjusting
Refrigerant
..........
19
A05307
Fig. 1 - Unit 48CE
.........................
19
...........................
20
...............................
20
Unit Troubleshooting
.............................
20
Indoor Airflow
and Airflow Adjustments
..............
21
...............................
24-26
Air Filter
.......................................
24
..........................
24
Outdoor
Drain Pan
.....
24
Outdoor
....................................
24
......................
25
................................
25
..................................
25
Devices-TXV
& AccuRater
'
Piston
.........
25
................................
25
Loss-of-Charge
Switch
...........................
25
High Pressure Switch
.............................
25
Copeland
Scroll Compressors
(Puron Refrigerant)
.......
25
Refrigerant
System
...............................
25
...................................
25
Compressor
Oil ................................
25
...
26
Liquid Line Filter Drier ..........................
26
..............
26
.............................
26
START-UP
CHECKLIST
...........................
26
SAFETY
CONSIDERATIONS
Installation
and servicing
of this equipment
can be hazardous
due to
mechanical
and electrical
components.
Only trained
and qualified
personnel
should install, repair, or service this equipment.

Advertisement

Table of Contents
loading

Table of Contents