Mira Play 8.5 kW Installation & User Manual page 13

Electric shower
Table of Contents

Advertisement

10.
Connect supply pipe. Do not
overtighten!
12.
Firmly connect the conductors. Do
not exert strain on the terminal
block.
14.
Refit the Service Tunnel and Cover.
Make sure they fit correctly.
Do not overtighten screws.
11.
13.
L = BROWN
= GREEN
N = BLUE
15.
13
Feed cable into Case. Fit Earth
sleeve (not supplied) and strip
insulation.
Do not twist cable cores.
Make sure wires are clear of all
mounting holes.
Do not use alternative screws to
secure the Cover. This can cause
internal damage to the appliance.
Do not seal around the back of
appliance.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Play 10.8 kwPlay 9.5 kw

Table of Contents