4
PROCEDURES BEFORE OPERATION
This chapter describes the procedures before operation.
1.
Installing the module
Install the flexible high-speed I/O control module with a desired configuration.
Page 34 Overall Configuration
2.
External wiring
Wire external devices to the flexible high-speed I/O control module.
Page 37 External Wiring
3.
Creating a hardware logic
Create a hardware logic with the configuration tool.
Page 63 FUNCTIONS OF THE CONFIGURATION TOOL
4.
Programming and debugging
Create and check a program.
Page 207 DISPLAY UNIT
4 PROCEDURES BEFORE OPERATION
32