Kyocera ECOSYS P4035dn Service Manual page 186

Hide thumbs Also See for ECOSYS P4035dn:
Table of Contents

Advertisement

5. Remove the connector (YC4) from the
PF main PWB.
6. Release the wires from hook.
7. Turn over the PF unit again.
8. Remove the right front cover.
9. Remove the five screws.
10. Pull the upper cover rear ends.
11. Remove the upper cover while pulling
out the paper size switch.
PF main PWB
Wires
Figure 1-5-162
Upper cover
Screw
Cassette size
switch
Figure 1-5-163
1-5-89
2P7/2R0/3PN
PF unit
Connector (YC4)
Hook
Screw
Screw
Screw
Right front cover
Screw

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ecosys p4040dnEcosys pf-4100

Table of Contents