Furuno FMD-3200 Installation Manual

Furuno FMD-3200 Installation Manual

Electronic chart display and information system
Hide thumbs Also See for FMD-3200:

Advertisement

Installation Manual
ECDIS
FMD-3200/FMD-3300/FMD-3200-BB
Model
(ELECTRONIC CHART DISPLAY AND INFORMATION SYSTEM)
SAFETY INSTRUCTIONS ................................................................................................ i
SYSTEM CONFIGURATION ........................................................................................... ii
EQUIPMENT LISTS........................................................................................................ iv
1. MOUNTING..............................................................................................................1-1
1.1 Monitor Unit........................................................................................................................1-1
1.2 ECDIS Control Unit/Track Control Unit ..............................................................................1-1
1.3 Processor Unit ...................................................................................................................1-4
1.4 Sensor Adapter MC-3000S/3010A/3020D/3030D (option) ................................................1-6
1.5 Intelligent Hub HUB-3000 (option) .....................................................................................1-7
1.6 Switching HUB HUB-100 (option) ......................................................................................1-8
1.7 Radar Connection Box RCB-002 (option)..........................................................................1-8
2. WIRING....................................................................................................................2-1
2.1 Processor Unit ...................................................................................................................2-3
2.2 Monitor Unit......................................................................................................................2-13
2.3 Sensor Adapters (option) .................................................................................................2-15
2.4 Intelligent HUB HUB-3000 (option) ..................................................................................2-33
2.5 How to Extend the Control Unit Cable (option) ................................................................2-34
2.6 Radar Connection Box RCB-002 (option)........................................................................2-38
3. ECN-303/304 (OPTION) ..........................................................................................3-1
3.1 How to Install the Console .................................................................................................3-1
3.2 How to Dismount the Rack for the Processor Unit.............................................................3-2
3.3 How to Connect External Cables .......................................................................................3-4
3.4 How to Mount the Rack for the Processor Unit..................................................................3-6
4. SETTING UP THE EQUIPMENT .............................................................................4-1
APPENDIX 1 JIS CABLE GUIDE .............................................................................AP-1
APPENDIX 2 ROD TERMINALS ..............................................................................AP-2
APPENDIX 3 RA/IF BOARD JUMPER VALUES .....................................................AP-8
PACKING LISTS ......................................................................................................... A-1
OUTLINE DRAWINGS ................................................................................................ D-1
INTERCONNECTION DIAGRAMS.............................................................................. S-1
www.furuno.com
All brand and product names are trademarks, registered trademarks or service marks of their respective holders.

Advertisement

Table of Contents
loading

Summary of Contents for Furuno FMD-3200

  • Page 1: Table Of Contents

    Installation Manual ECDIS FMD-3200/FMD-3300/FMD-3200-BB Model (ELECTRONIC CHART DISPLAY AND INFORMATION SYSTEM) SAFETY INSTRUCTIONS ....................i SYSTEM CONFIGURATION ................... ii EQUIPMENT LISTS......................iv 1. MOUNTING......................1-1 1.1 Monitor Unit........................1-1 1.2 ECDIS Control Unit/Track Control Unit ................1-1 1.3 Processor Unit ........................1-4 1.4 Sensor Adapter MC-3000S/3010A/3020D/3030D (option) ..........1-6 1.5 Intelligent Hub HUB-3000 (option) ..................1-7...
  • Page 2 ・FURUNO Authorized Distributor/Dealer 9-52 Ashihara-cho, Nishinomiya, 662-8580, JAPAN A : APR 2012 Printed in Japan All rights reserved. H2 : APR . 26, 2017 Pub. No. IME-44730-H2 ( TEHI ) FMD-3200/3200BB/3300 0 0 0 1 7 6 1 2 9 1 7...
  • Page 3: Safety Instructions

    SAFETY INSTRUCTIONS The installer of the equipment must read the safety instructions before attempting to install the equipment. WARNING Indicates a potentially hazardous situation which, if not avoided, could result in death or serious injury. Indicates a potentially hazardous situation which, if not avoided, CAUTION can result in minor or moderate injury.
  • Page 4: System Configuration

    100-115/200-230 VAC 1ø, 50/60 Hz *: MU-190: Standard supply for FMD-3200 MU-231: Standard supply for FMD-3300 MU-270W: Standard supply for FMD-3300 HD26T21-MMD-MA4-FAGA: Standard supply for FMD-3300 Note: The following monitors are available with the FMD-3200-BB: Viewing Viewing Maker Model Maker...
  • Page 5 *: MU-190: Standard supply for FMD-3200 MU-231: Standard supply for FMD-3300 MU-270W: Standard supply for FMD-3300 HD26T21-MMD-MA4-FAGA: Standard supply for FMD-3300 Note: The following monitors are available with the FMD-3200-BB: Viewing Viewing Maker Model Maker Model distance (m)
  • Page 6: Equipment Lists

    EQUIPMENT LISTS Standard Supply Name Type Code No. Remarks Monitor Unit MU-190 For FMD-3200, 19-inch MU-231 For FMD-3300, 23.1-inch MU-270W For FMD-3300, 27-inch HD26T21-MMD- For FMD-3300, supplied for the MA4-FAGA HK specification. Processor Unit EC-3000 ECDIS Control Unit RCU-024 Trackball Control Unit...
  • Page 7 OP24-23 001-171-780 For EC-3000 Flush Mount OP24-24 001-171-790 For RCU-024 OP24-27 001-171-820 For RCU-026 Connection Stand OP24-25 001-171-800 For RCU-024, FMD-3200 (19) Connection Stand OP24-26 001-171-810 For RCU-024, FMD-3300 (23) Case Gasket OP24-28 001-169-970 For MC-3000S OP24-29 001-169-960 For MC-3010A/3020D/3030D...
  • Page 8 EQUIPMENT LISTS Name Type Code No. Remarks Dust Cover 26-007-1201 001-116-260-10 For MU-190 26-007-2141 001-121-240-10 For MU-231 26-009-1093 001-439-120 For MU-270W 03-163-7271 001-121-230-10 For console type Installation Materials CP03-28900 000-082-658 LAN cable for sensor adapter, 10 m CP03-28910 000-082-659 LAN cable for sensor adapter, 20 m CP03-28920 000-082-660 LAN cable for sensor adapter, 30 m...
  • Page 9 EQUIPMENT LISTS Name Type Code No. Remarks Cable Assy. MJ-A10SPF0020A- Cable between RCB-002 and ex- 001-283-370 050+ ternal radar, 5 m MJ-A10SPF0020A- Cable between RCB-002 and ex- 001-283-380 100+ ternal radar, 10 m MJ-A10SPF0020A- Cable between RCB-002 and ex- 001-283-390 200+ ternal radar, 20 m MJ-A10SPF0020A-...
  • Page 10 EQUIPMENT LISTS This page is intentionally left blank. viii...
  • Page 11: Mounting

    MOUNTING NOTICE Do not apply paint, anti-corrosive sealant or contact spray to coating or plastic parts of the equipment. Those items contain organic solvents that can damage coating and plastic parts, especially plastic connectors. Monitor Unit To mount the monitor unit, see the operator’s manual supplied with the monitor unit. Make sure that the ground wire is connected between the earth terminal on the chas- sis and the ship’s earth.
  • Page 12 1. MOUNTING 1.2.1 Desktop Mounting Fixing with KB fixing metal 1. Fix the KB fixing metal to the bottom of the control unit. 2. Fix the unit with self-tapping screws (5x20, local supply). KB fixing metal RCU-026 RCU-024 Side view of control units Fixing without KB fixing metal 1.
  • Page 13: Flush Mounting

    1. MOUNTING 1.2.2 Flush mounting Use the optional flush mount kit to mount the control unit in a console panel. Flush mount kits for RCU-024/025 Control Unit Type Code No. RCU-024 OP24-24 001-171-790 RCU-026 OP24-27 001-171-820 1. Prepare a cutout in the mounting location as shown on below. Outline of unit Outline of unit 388±2...
  • Page 14: Processor Unit

    1. MOUNTING Processor Unit 1.3.1 Mounting considerations When you select a mounting location, keep in mind the following points: • Locate the processor unit away from heat sources because of heat that can build up inside the cabinet. • The vibration at the mounting location should be minimum. •...
  • Page 15 1. MOUNTING 1.3.2 How to mount the processor unit Use six bolts (M6, local supply) to mount the processor unit. 1. Use 10 binding head screws (M4x8, supplied) to attach the chassis bases 1 and 2 to the processor unit. Note: For bulkhead mounting, attach the chassis base 2 so that the notches on it are facing the deck.
  • Page 16: Sensor Adapter Mc-3000S/3010A/3020D/3030D (Option)

    1. MOUNTING Sensor Adapter MC-3000S/3010A/3020D/3030D (option) Mounting considerations When you select a mounting location, keep in mind the following points: • Locate the adapter away from heat sources because of heat that can build up inside the cabinet. • The vibration should be minimal. •...
  • Page 17: Intelligent Hub Hub-3000 (Option)

    1. MOUNTING Intelligent Hub HUB-3000 (option) Use the optional Intelligent Hub HUB-3000 to connect gateway network equipment. This network cannot be connected with the LAN network on board. Note that a com- mercial PC cannot be connected in this network, other than for the maintenance. Mounting considerations When you select a mounting location, keep in mind the following points: •...
  • Page 18: Switching Hub Hub-100 (Option)

    1. MOUNTING Switching HUB HUB-100 (option) Use the optional Switching HUB HUB-100 to connect sensor networks. This network cannot be connected with the LAN network on board. Note that a commercial PC can- not be connected in this network, other than for the maintenance. The total length of all cables connected to the hub is 6 m.
  • Page 19 1. MOUNTING 1. Referring to the outline drawing at the back of this manual, drill four holes ( 5 20) in the mounting location. 2. Fix the unit firmly in place using 5 20 self-tapping screws. Mounting holes Connectors facing downwwards...
  • Page 20 1. MOUNTING This page is intentionally left blank. 1-10...
  • Page 21: Wiring

    -MC-3010A (ANALOG) -MC-3020D (Digital IN) -MC-3030D (Digital OUT) 100-230 VAC 24 VDC Note: The following monitors are available with the FMD-3200-BB. For the cable be- tween the monitor other than MU-190/MU-231/270W and processor unit, use the ca- ble assy. (type: DSUB9P-X2-A-L5M/10M).
  • Page 22 2. WIRING Maker Model Maker Model FURUNO MU-190 Hatteland JH20T17FUD MU-231 JH23T12FUD MU-270W JH23T14FUD MU-201CE HD24T21MMD MU-231CE JH26T11MMD Hatteland JH19T14FUD HD26T21MMD Notice for the network construction • Use the optional Switching Hub HUB-100 to connect the sensor networks. For the gateway networks, use the optional Intelligent Hub HUB-3000.
  • Page 23: Processor Unit

    2. WIRING Processor Unit 2.1.1 How to connect cables to terminals on the processor unit Use screws (M3x6, supplied) to attach the wiring plate 1 and wir- ing plate 2 assy to the processor unit. Connect the cables shown below to the connectors at the front of the processor unit.
  • Page 24 2. WIRING Fabricating LAN cable Fabricate the LAN cable (FR-FTPC-CY, DTI-C5E350 VCV), as shown below. (Wrap both edges of the armor with vinyl tape.) Confirm that the shield of the cable touches to the shell of the modular plug. Cable jacket Armor Inner vinyl sheath Outer vinyl sheath Wrap vinyl tape.
  • Page 25 2. WIRING IPX2 kit The optional IPX2 kit (Type: OP24-23, Code No.: 001-171-780) protects the connec- tors shown below to waterproofing standard IPX2. Contents of IPX2 kit Name Type Code No. Remarks Binding Screw #4-40UNCX3/16 000-176-619-10 Connector Gasket 1 24-014-0107 100-367-730-10 For D-sub connectors Connector Gasket 2...
  • Page 26 2. WIRING 2.1.2 How to connect cables inside the processor unit Fabrication Fabricate JIS cables as shown below to connect them to the WAGO connectors on the I/O Board 24P0124 inside the processor unit. For locations of cables and cores, see the sticker on the reverse side of the top cover. (All dimensions in millimeters) Fabrication of TTYCS series Armor...
  • Page 27 2. WIRING Connection 1. Unfasten four screws (M4x8) to remove the top cover from the processor unit. 2. Unfasten three bolts shown below to remove the upper plate of the cable clamp. Clamp holes (upper) Loosen this bolt to use Loosen this bolt to use the lower clamp holes.
  • Page 28 2. WIRING 4. Connect the WAGO connectors appropriately to the I/O Board, referring to the in- terconnection diagram. J12 (main control unit) For J13 and J14 (sub control units), see the figure at step 2 on the previous page. 5. Bind the cables to the fixing metal in the processor unit with the cable ties (sup- plied).
  • Page 29 2. WIRING 2.1.3 How to set jumper blocks on I/O Board How to set the termination resistors Use the jumper blocks JP1 and JP2 on the I/O Board (24P0124) to set the termination resistor J3 and J4 on or off. The default setting is termination resistor: on. •...
  • Page 30 2. WIRING How to select the serial input/output format Use the connectors J3 and J4 to set the input/output format for serial CH1/CH2, from IEC-61162-1 or IEC-61162-2. For connectors J5 to J10, use TTYCS-1Q or TTYCSLA- 1Q cable for a connector. Connector J3 Pin # Signal...
  • Page 31 2. WIRING Connector J6 Pin# Signal In/Out Description Remarks TD4-A Serial CH4, output IEC61162-1 Use TTYCS(LA)-1Q, IREC61162-1 only TD4-B Serial CH4, output IEC61162-1 RD4-H Serial CH4, input IEC61162-1 RD4-C Serial CH4, input IEC61162-1 Connector J7 Pin# Signal In/Out Description Remarks TD5-A Serial CH5, output IEC61162-1 Use TTYCS(LA)-1Q,...
  • Page 32 2. WIRING How to set contact input/output The connector J11 can be used for the connection of contact input or voltage input. Refer to the figures shown below to make the wiring which complies with the input specification. Note: The input must not exceed the range of the input voltage, to prevent malfunc- tion.
  • Page 33: Monitor Unit

    2. WIRING Monitor Unit For the wiring of the monitor unit, see the operator’s manual supplied with the monitor unit. Mounting consideration (Standard type) • Connect the ECDIS main monitor to the DVI1 and COM1 ports. • For the sub ECDIS monitor, connect it to the DVI2 and COM2 port. (Conning type) •...
  • Page 34 2. WIRING Setting for MU-190/MU-231/MU-270W The [INSTALLATION SETTING] menu appears only when the power is turned on for the first time after installation of the monitor unit. Menu INSTALLATION SETTING EXT BRILL CTRL RS-485 (OFF/DVI1/DVI2/RS-232C/RS-485/USB) SERIAL BAUDRATE 4800bps (4800/9600/19200/38400) COLOR CALIBRATION (OFF/ON) Menu item KEY LOCK...
  • Page 35: Sensor Adapters (Option)

    2. WIRING Sensor Adapters (option) Maximum eight MC-3000S can be connected to a sensor network (for the redundant connection: 16). The MC-3000S (serial input/output, IEC61162-2/1, 4ch) can connect max. 10 sensor adapters using the MC1.5-W cables. The maximum number of MC- 3010A units is five.
  • Page 36 2. WIRING 2.3.1 MC-3000S Use the LAN cable FR-FTPC-CY cable to connect the MC-3000S and the processor unit. With HUB-100, a maximum of eight MC-3000S can be connected. Fabrications TTYCS-1Q cable LAN cable (FR-FTPC-CY) (J9) (J9) (J9) (J8) (J8) (J8) #1 to 4: 100 #1 to 4: 100 #1 to 4: 100...
  • Page 37 2. WIRING TTYCSLA-1 cable TTYCS-1 cable Core: 6 Core: 6 Core: 6 Core: 6 Core: 6 Core: 6 Vinyl tape Vinyl tape Vinyl tape Shield (fold back) Shield (fold back) Shield (fold back) Vinyl tape Vinyl tape Vinyl tape (width: 10) (width: 10) (width: 10) (width: 10)
  • Page 38 2. WIRING Connections Unfasten four screws to remove the cover, pass the cables through the clamps and attach the cables to respective connectors. The shield part of the cable (or drain wire) must be fastened by (connected to) the clamp. For TTYCSLA cables, pass the drain wire into the shrinking tube (local supply), then use these crimp-on lugs and screws...
  • Page 39 2. WIRING How to set input specification (J4 to J9) For connectors J4 to J7, the connections are different depending on the input specifi- cations as shown below. Connector J4 Signal In/Out Description IEC61162-2 IEC61162-1 Modbus* name TD1-A Serial CH1, out- TTYCS(LA)-4 TTYCS(LA)-4 TTYCS(LA)-4...
  • Page 40 2. WIRING Connector J6 Signal In/Out Description IEC61162-2 IEC61162-1 name TD3-A Serial CH3, output IEC61162-1/2 TTYCS(LA)-4 TTYCS(LA)-4 TD3-B Serial CH3, output IEC61162-1/2 RD3-A Serial CH3, input IEC61162-2 No connection RD3-B Serial CH3, input IEC61162-2 ISOGND3 Isolation, GND (CH3) RD3-H Serial CH3, input IEC61162-1 No connection TTYCS(LA)-4 RD3-C Serial CH3, input IEC61162-1...
  • Page 41 2. WIRING Case packing OP24-28 The optional kit OP24-28 protects the connectors on the MC-3000S to waterproofing standard IPX2. Case packing (type: OP24-28, code no.: 001-169-970) Name Type Code No. Remarks Case packing (serial) 21-014-2051 100-367-880-10 2 For MC-3000S 1. Unfasten four binding screws to remove the cover from the adapter. Binding screw Cover 2.
  • Page 42 2. WIRING 2.3.2 MC-3010A/3020D/3030D • MC-3010A: Inputs analog signal. To set MC-3010A to the current input, connect short pins to each terminals. • MC-3020D: Inputs digital signal (8ch contact input). Contact or voltage input is se- lectable (contact input requires short pins). •...
  • Page 43 2. WIRING Connection For TTYCSLA cables, pass the drain wire through the shrink tube, then attach these crimp- on lugs and screws to connect drain wires to here. IV-1.25sq. (Local supply) IV-1.25sq. (Local supply) TTYCS-1/ TTYCS-1/ TTYCSLA-1 TTYCSLA-1 MC1.5-W-L cable MC1.5-W-L cable Note: Fasten the cable shield with the cable clamp.
  • Page 44 2. WIRING • Power voltage: Input the amount of power voltage change to the operational ampli- fier. AN +15V +15V +VS1 AN - IN Voltage +VS2 source AN-GND ISO122 OutGnd CURR-JP1 - VS2 InGnd CURR-JP2 - VS1 Jumper: open 1kΩ 1% 0.5Wx2 Load - 15V AN GND AN - 15V...
  • Page 45 2. WIRING Connector J5 Power Power Signal name In/Out Description voltage current AN3_IN Analog 3 input TTYCS(LA)-1 AN3_GND Analog 3 GND CURR3_JP1 Analog 3 input, power current/ Pin #3-#4: Pin #3-#4: voltage setting jumper 1 open short CURR3_JP2 Analog 3 input, power current/ voltage setting jumper 1 How to set ACK input (MC-3020D) Use the connectors J3 to J6 on the MC-DIN Board (24P0116) to set the ACK input for...
  • Page 46 2. WIRING Connector J3 ACK1 ACK1 ACK2 ACK2 Signal name In/Out Remarks contact voltage contact voltage DC12V_OUT ACK1 In Pin #1-#2: No connec- short tion DIGI_IN1 MPYC-12 DIGI_RTN1 MPYC-12 GND (DC12V) In No connec- tion DC12V_OUT ACK2 In Pin #1-#2: No con- short nection...
  • Page 47 2. WIRING Connector J6 ACK7 ACK7 ACK8 ACK8 Pin # Signal name In/Out Remarks contact voltage contact voltage DC12V_OUT ACK7 In Pin #1-#2: No connec- short tion DIGI_IN7 MPYC-12 DIGI_RTN7 MPYC-12 GND (DC12V) In No connec- tion DC12V_OUT ACK8 In Pin #1-#2: No con- short...
  • Page 48 2. WIRING Connector J5 Signal Alarm5 NC Alarm6 NO Alarm6 NC Remarks Alarm5 NO Out name Alarm5 MPYC-12 No connection COM5 MPYC-12 No connection Alarm5 MPYC-12 No connection COM6 MPYC-12 No connection Connector J6 Signal Alarm7 NC Alarm8 NO Alarm8 NC Remarks Alarm7 NO Out name...
  • Page 49 2. WIRING 2. Peel the paper from the case packing, then attach the case packing to the reverse side of the cover and the body unit as shown below. Case packing Case packing Cover (reverse side) Case packing Case packing Chassis 3.
  • Page 50 2. WIRING 2.3.3 How to set jumper blocks in the sensor adapters MC-3000S Set the jumper blocks in the MC-CS Board (24P0114) referring to the tables that fol- low. MC-CS Board (24P0114) Rotary switch: Use the rotary switch (S2) to set the Modbus address when setting connectors J4/J5 to Modbus.
  • Page 51 2. WIRING (Termination resistor ON) • When setting the starting/ending terminal for the multipoint, or the multipoint is not connected (CH1 to 4). • When setting the starting/ending terminal for Modbus (CH1, CH2) (Terminal resistor OFF) • When setting the terminal other than starting/ending for the multipoint (CH1 to 4). •...
  • Page 52 2. WIRING MC-3010A/3020D/3030D This paragraph shows how to set the MC-ANLG Board (24P0115, for MC-3010A), MC-DIN Board (24P0116, for MC-3020D) and MC-DOUT Board (24P0117, for MC- 3030D). Rotary switch: Use the rotary switch (U18) to set the MODBUS address with a digit of number from “0”.
  • Page 53: Intelligent Hub Hub-3000 (Option)

    2. WIRING Intelligent HUB HUB-3000 (option) Fix the LAN cable connected to the cable clamp using the cable ties (supplied). Power port Power Fail DPYC-1.5 cable DPYC-1.5 cable Ground wire (IV-1.25sq., supplied) LAN cable No use. LAN port to INS network (ECDIS, radar, etc.) Attach the LAN cap (supplied) to the unused connector holes to provide waterproofing standard IPX2.
  • Page 54: How To Extend The Control Unit Cable (Option)

    2. WIRING How to Extend the Control Unit Cable (option) To extend the length of the cable between the control unit and the processor unit, use the optional cable assy 6TPSH-XH12X2-LxxSP1 (for RCU-024) or 6TPSH-XH12X2- LxxSP2 (for RCU-026). You can select the cable length from among 10, 20 and 30 m. 2.5.1 ECDIS control unit (RCU-024) 1.
  • Page 55 2. WIRING 8. Unfasten three bolts to remove the cable clamp (upper) as shown below. Clamp holes (upper) Loosen this bolt to use Loosen this bolt to use the lower clamp holes. the lower clamp holes. Clamp holes (lower) Loosen these three bolts to remove the upper plate. 9.
  • Page 56 2. WIRING 2.5.2 Trackball control unit (RCU-026) 1. Unfasten four binding screws (M3x8) from the bottom of the control unit, and a pan head screw (M3x8) and flat washer from the back of the control unit to remove the cover. Note: Be careful not to add stress to the cables connected to the control unit board when removing the cover.
  • Page 57 2. WIRING 5. Fasten the shield part of the cable assy with the cable clamp (removed at step 2), then connect the connector at the end of the cable assy to the J1 on the control unit board. Note: When clamping, the shield part of the cable must not touch the circuit board. Shield part Cable assy Cable clamp...
  • Page 58: Radar Connection Box Rcb-002 (Option)

    2. WIRING 10. Set the shields of cables under the cable clamp then tighten the cable clamp. Lay shields of cables under this clamp then tighten the clamp. 11. Remount the processor unit cover. Radar Connection Box RCB-002 (option) The RCB-002 is capable of connecting the FMD-3 00 with up to two external radar systems.
  • Page 59 2. WIRING 2. Dismantle the seal assembly as shown below. Dismantling the seal assembly STEP 1: Hold the larger diameter end of the seal assembly with both thumbs while placing index fingernails between the seal and the claw. Use caution to avoid injury. STEP 2: Using your thumbs, gently push the seal out of the claw.
  • Page 60 Tokyo Keiki Inc. BR-3440 series • Model 1835 *: FURUNO radars are only compatible with the CH2 (RADAR SIGNAL IN NO.2 port). Change the jumper settings on the RA/IF board (24P0140) according to the radar to be connected, referring the tables on the next page. For details of the values for each jumper block on the RA/IF board (24P0140), see "RA/IF BOARD JUMPER...
  • Page 61 Using the table below for reference, change the jumper settings to suit the appropriate radar connection. Use the figure on the previous page for jumper locations. Radar to be connected Jumper FURUNO radars JMA-9100 series BR-3440 series #2-3: short #1-2: short...
  • Page 62 2. WIRING This page is intentionally left blank. 2-42...
  • Page 63: Ecn-303/304 (Option)

    ECN-303/304 (OPTION) This section provides the information necessary for installing the display unit console ECN-303/304. Processor unit How to Install the Console 1. Install a channel base (height: 100 mm), consulting with the shipyard. 2. Pass a lifting belt through the four eye bolts at the top of the console. Hoist the console with a crane and place it on top of the channel base.
  • Page 64: How To Dismount The Rack For The Processor Unit

    3. ECN-303/304 (OPTION) How to Dismount the Rack for the Processor Unit If it is difficult to access the inside bottom of the console (for wiring), follow the proce- dure in this section to remove the rack for the processor unit. Otherwise, go to paragraph 3.3 How to Connect the External Cables.
  • Page 65 3. ECN-303/304 (OPTION) 3. Release all cables other than the power cable from their cable clamps. There are six cable clamps on the rack as shown below. 4. Press the stoppers with your fingers to unlock them to release the rack, then pull out the rack slowly.
  • Page 66: How To Connect External Cables

    3. ECN-303/304 (OPTION) How to Connect External Cables Pass the cables from external equipment through the bottom of the console. Connect the cables to the terminal board as shown in the interconnection diagrams in this man- ual and the label attached to the bottom of the console. Lay shields of cables under clamps then tighten clamps.
  • Page 67 3. ECN-303/304 (OPTION) Fabrication of TTYCS cable Armor Shield 100 or more Vinyl tape After exposing cores, wind shield around the armor. Clamp here by cable clamp. Fabrication of TTYCSLA cable Sheath Drain wire 100 or more Pass the drain wire through the shrink tube Vinyl tape (local supply), then attach the crimp-on lug supplied in the console.
  • Page 68: How To Mount The Rack For The Processor Unit

    3. ECN-303/304 (OPTION) How to Mount the Rack for the Processor Unit After completing the wiring, remount the rack if it was removed at section 3.2. Note: Leave sufficient space at the sides and rear of the unit to facilitate maintenance. 1.
  • Page 69 3. ECN-303/304 (OPTION) 4. Press the stoppers with your fingers to unlock them to release the rack, then push the rack into the console. 5. Fasten two hex. bolts (M6, removed at step 2 in section 3.2.) to fix the rack to the console.
  • Page 70 3. ECN-303/304 (OPTION) This page is intentionally left blank.
  • Page 71: Setting Up The Equipment

    SETTING UP THE EQUIPMENT Set up the ECDIS from the [Common Installation Setting] menu after the installation. For details of the [Common Installation Setting] menu, see the instruction manual (E42-01204).
  • Page 72 4. SETTING UP THE EQUIPMENT This page is intentionally left blank.
  • Page 73: Appendix 1 Jis Cable Guide

    EX: TTYCYSLA - 4 MPYC - 4 TTYCSLA-4 # of cores Designation type Designation type # of twisted pairs The following reference table lists gives the measurements of JIS cables commonly used with Furuno products: Cable Core Cable Core Diameter Diameter...
  • Page 74 APPENDIX 2 ROD TERMINALS MC-3000S, MC-CS Board (24P0114) Connector # Pin # Signal name Rod terminal to use Connected cable 24V_VOUT AI 0.34-6 TQ (blue) 24V_GND MODBUS-A AI 0.14-8 GY (gray) MC1.5-W-Lxxx MODBUS-B Connector # Pin # Signal name Rod terminal to use Connected cable 24V_IN AI 1.5-6 BK (black)
  • Page 75: Appendix 2 Rod Terminals

    APPENDIX 2 ROD TERMINALS Connector # Pin # Signal name Rod terminal to use Connected cable TD4-A TD4-B RD4-A TTYCS-4 RD4-B AI 0.75-6 GY (gray) TTYCSLA-4 ISOGND4 RD4-H RD4-C Connector # Pin # Signal name Rod terminal to use Connected cable TD5-A TD5-B TTYCS-1Q...
  • Page 76 APPENDIX 2 ROD TERMINALS MC-3010A MC-ANALG Board (24P0115) Connector # Pin # Signal name Rod terminal to use Connected cable 24V_IN AI 0.34-6 TQ (blue) 24V_GND MODBUS-A AI 0.14-8 GY (gray) MC1.5-W-Lxxx MODBUS-B Connector # Pin # Signal name Rod terminal to use Connected cable 24V_OUT AI 0.34-6 TQ (blue)
  • Page 77 APPENDIX 2 ROD TERMINALS MC-3020D, MC-DIN Board (24P0116) Connector # Pin # Signal name Rod terminal to use Connected cable 24V_IN AI 0.34-6 TQ (blue) 24V_GND MODBUS-A AI 0.14-8 GY (gray) MC1.5-W-Lxxx MODBUS-B Connector # Pin # Signal name Rod terminal to use Connected cable 24V_OUT AI 0.34-6 TQ (blue)
  • Page 78 APPENDIX 2 ROD TERMINALS Connector # Pin # Signal name Rod terminal to use Connected cable DV12V_OUT7 DIGI_IN7 DIGI_RTN7 AI 1-6 RD (red) MPYC-12 DC12V_OUT8 DIGI_IN8 DIGI_RTN8 *: Pin #1 and 5: no cable connection. However the jumper connection is necessary between #1 and 2 and #5 and 6 depending on the input specification.
  • Page 79 APPENDIX 2 ROD TERMINALS MC-3030D, MC-DOUT Board (24P0117) Connector # Pin # Signal name Rod terminal to use Connected cable 24V_IN AI 0.34-6 TQ (blue) 24V_GND MODBUS-A AI 0.14-8 GY (gray) MC1.5-W-Lxxx MODBUS-B Connector # Pin # Signal name Rod terminal to use Connected cable 24V_OUT AI 0.34-6 TQ (blue)
  • Page 80: Appendix 3 Ra/If Board Jumper Values

    APPENDIX 3 RA/IF BOARD JUMPER VALUES The values for each jumper block on the RA/IF board (24P0140) are shown below. CH1/CH2 signal settings J1/J8 HD-TERM J3/J16 VID-TERM J5/J18 BP-TERM J10/J22 TRG-TERM 1.2 kΩ 75Ω 1.2 kΩ 50Ω 75Ω 50Ω 1.2 kΩ 180kΩ...
  • Page 95 Y.NISHIYAMA 13/Jan/2012 西山義浩 電子署名者 : 西山 義浩 DN : cn= 西山義浩, o, ou= 情技課, email=yoshihiro.nis hiyama@furuno.co.jp, c=JP - 日本 日付 : 2012.01.13 14:53:33 +09' 0 0'...
  • Page 96 Y.NISHIYAMA 13/Jan/2012 西山 義浩 電子署名者 :西 義浩 DN : cn=西山 浩, o, ou=情技 email=yoshih nishiyama@fu o.co.jp, c=JP - 日付 : 2012.01 14:54:40 +09'0...
  • Page 97 D-10 Y.NISHIYAMA 13/Jan/2012 西山義浩...
  • Page 98 D-11 Y.NISHIYAMA 13/Jan/2012...
  • Page 99 D-12...
  • Page 100 D-13 11/Dec/2013 H.MAKI...
  • Page 101 D-14...
  • Page 102 D-15...
  • Page 103 D-16...
  • Page 104 17/Nov/2016 H.MAKI 15/Jul/2015 H.MAKI...
  • Page 105: Interconnection Diagrams

    選択 SELECT 制御部 センサーアダプター PROCESSOR SENSOR ADAPTER UNIT MC-3000S(SERIAL 8ch) EC-3000 パネルPC部 PANEL COMPUTER UNIT PCU-3000 または OR スイッチングハブ SWITCHING HUB HUB-100 IV-1.25sq. 3-4間ジャンパー設定 オープン:電圧入力、ショート:電流入力 JUMPER SETTING BETWEEN 3 AND 4; OPEN: VOLTAGE INPUT, CLOSE: CURRENT INPUT IV-1.25sq. IV-1.25sq. 注記 *1)造船所手配。...
  • Page 106 注記 NOTE スタンダードコンソール H.MAKI 13/Nov/2012 *1)造船所手配。 *1: SHIPYARD SUPPLY. APPROVED 相互結線図 *2)オプション。 *2: OPTION. 14/Nov/2012 Y.NISHIYAMA FMD-3200/3300 SCALE MASS NAME *3)センサーアダプターはMC-3000Sを含む *3: A CONSOLE CAN INCLUDE THREE UNITS (MC-3000S INCLUDED) STANDARD CONSOLE 3台までコンソール内に収納可。 AMONG SENSOR ADAPTERS. DWG.No. REF.No. INTERCONNECTION DIAGRAM...

This manual is also suitable for:

Fmd-3200-bbFmd-3300

Table of Contents