Extron electronics System 5 IP Series Setup Manual page 26

System switchers
Hide thumbs Also See for System 5 IP Series:
Table of Contents

Advertisement

im Vertrieb von
System 5 IP Software Setup, cont'd
6.
Set the lamp hour limit by doing the following:
a. Choose Lamp Usage Time (hours): Value under the
Available Options window.
b. Enter a value (800, for example) in the Lamp Usage
Time (hours) box.
c.
Click Apply Condition.
d. Click Next.
7.
Click Next again to add an e-mail notification.
Display lamp hour e-mail notification
8.
Click on the appropriate e-mail message and contacts, then
click Apply Email/Contacts.
9.
Click Done. The dialog box closes.
Step 10: Create a Dsplay Dsconnecton
E-mal
To set a display disconnected e-mail alert, do the following:
1.
Click the Monitor tab in the Global Configurator window.
2.
Click the Add Monitor button below the Monitored
Conditions window. The Monitored Conditions Wizard
window appears.
3.
Enter a name (Disconnected) in the Enter Monitored
Condition Name field area. The label now appears in the
left pane.
www.camboard.de
3-22
System 5 IP Switchers • Software Setup
CAMBOARD Electronics
Step 11: Buld and Upload a Configuraton
Buldng a configuraton
Tel. 07131 911201
Fax 07131 911203
4.
Click Next to specify a condition.
5.
Select the desired equipment (for our purposes, choose the
Epson PowerLite 7700p) from the Subject Port window
and Connection Status is Disconnected from Available
Options.
6.
Click Apply Condition, then click Next.
7.
Click Next again to add an e-mail notification.
8.
Highlight the appropriate e-mail message (Disconnect
Notification) and contacts (e-mail recipient(s)), and click
Apply Email/Contacts.
9.
Click Done. The dialog box closes.
The Global Configurator project file contains all the
configuration data (port assignments, product/device locations,
scheduling data, etc.) you have created in Global Configurator.
This is the data used to build the project's GlobalViewer Web
pages for the System 5 IP.
To build a configuration, do the following:
1.
Click the GlobalViewer tab at the left window to open
GlobalViewer Designer.
2.
Confirm that all configured products have been given a
location. If not, drag each product to the desired location
or create new ones.
3.
Save your project file. If a project file has not been
saved, GC prompts you to do so before building the
configuration.
4.
From the Build menu, choose Build All Configurations or
Build Changed Configurations.
The Build menu
An activity bar appears, indicating that the build is
progressing. The Upload Manager dialog box appears
when the build is complete.
ce-info@camboard.de
System 5 IP Switchers • Software Setup
3-23

Advertisement

Table of Contents
loading

Table of Contents