SiBE04-824
1.6
Removal of
Procedure
Step
1. Removing the
shelter
1
The figure shows the
appearance of the
electrical box.
2
Open the shelter (at the
back).
3
Push the upper centre
of the shelter and
unfasten the hooks at
the upper 2 positions of
the shelter.
2. Removing the
heat
exchanger thermistor
1
Remove the heat
exchanger thermistor
and disconnect the
earth wire.
Removal Procedure
PCB
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Procedure
Indoor Unit
Points
Preparation
Remove the electrical box
according to the "Removal
of Electrical Box."
151