Creating A Project; Transfer Inverters Connected Via Usb Into The Project - Siemens SINAMICS G120D Operating Instructions Manual

With control units cu250d-2
Hide thumbs Also See for SINAMICS G120D:
Table of Contents

Advertisement

Commissioning
5.4 Basic commissioning with a PC
5.4.1

Creating a project

Creating a project
Procedure
In order to create a new project, proceed as follows:
1. In the menu, select "Project" → "New...".
2. Specify a name of your choice for the project.
You have created a new project.
5.4.2

Transfer inverters connected via USB into the project

Transferring inverters connected via USB to the project
Procedure
Proceed as follows to transfer an inverter connected via USB to your project:
1. Switch on the inverter supply voltage.
2. First insert a USB cable into your PC and then into the inverter.
3. The PC operating system installs the USB driver when you are connecting the inverter
and PC together for the first time.
– Windows 7 installs the driver automatically.
– For Windows XP you must acknowledge several system messages.
4. Start the commissioning software.
5. Select the "Accessible nodes".
Figure 5-5
70
"Accessible nodes" in STARTER
Converter with control units CU250D-2
Operating Instructions, 04/2015, FW V4.7.3, A5E34261542B AB

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents