Installing The Lower Triple Clamp - Husqvarna FE 450 2016 Owner's Manual

Hide thumbs Also See for FE 450 2016:
Table of Contents

Advertisement

12
SERVICE WORK ON THE CHASSIS
12.10

Installing the lower triple clamp

Main work
Open cable holder
H00215-10
Remove screw
handlebar and set it aside.
Info
Cover the components to protect them against damage.
Do not bend the cables and lines.
H00216-10
Remove O-ring
Take off the lower triple clamp with the steering stem.
Remove the upper steering head bearing.
C00567-11
Main work
Clean the bearing and sealing elements, check for damage, and grease.
High viscosity grease (
Position the lower triple clamp with the steering stem. Mount the upper steering
head bearing.
Check whether the upper steering head seal
Mount protective ring
M00420-10
Position the upper triple clamp with the handlebar.
Mount screw
Position the clutch line next to the voltage regulator.
H00217-10
in front of the right radiator and detach the wiring harness.
. Remove screw
, take off the upper triple clamp with the
. Remove protective ring
p. 114)
and O-ring
but do not tighten yet.
.
is correctly positioned.
.
45

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fe 501 2016

Table of Contents