Preparation For Installation; Electrical Connection; Water Supply Connection - ECM Compact HX-2 User Manual

Table of Contents

Advertisement

Available languages

Available languages

Bedienungsanleitung / User manual COMPACT HX-2

4.1 Preparation for installation

• Place the machine on an even and stable surface. You can regulate the height by adjusting the
feet of the machine.
• Never place the machine on hot surfaces.

4.2 Electrical connection

• The electrical connection has to be conducted by an authorised specialty dealer.

4.3 Water supply connection

Important
Make sure that the water supply installation is connected to a potable water supply with an operating
pressure with max 3 bars. Please note that often the pressure of the water supply varies. If the water
supply pressure temporarily exceeds 1.5 bars, use a pressure regulator. Furthermore, a shut-off valve
should be used. This valve should be located where it is easily reached, so that the water supply can
be interrupted at any time.
Water connection 3/8"
Important
Rotary pumps require pre-pressure. For this reason, they should always be connected to a fixed water
supply and not be used with an external, pressure-less water container. This could damage the pump.
4.4 Installation of the water drainage
The hose for the waste water is inserted into the appropriate L-connector at the bottom of the machine and the
already installed syphon drainage. Then the L-connector is screwed together with the drainage funnel. Please make
sure that the drainage hose is positioned in a manner that no water can accumulate in it.
Important
• Connecting the machine to a fixed water connection and installing the pressure regulator has to
be carried out by authorized service personnel.
• In order to avoid a premature calcification of your machine, we recommend to install a water
softening system.
Connecting the metal hose
17
Connection (wrench size 20)
ENGLISH

Advertisement

Table of Contents
loading

Table of Contents