Intellichem Controller System Power Up Sequence - Pentair intellichem Installation And User Manual

Water chemistry controller
Table of Contents

Advertisement

4
IntelliChem
®
IntelliChem
Controller
®
v1.060 09/04/2014
Pentair Aquatic
Systems
AUTO CALIBRATION
AUTO CALIBRATION
pH
6.35 7.65
ORP 738
398
***PASSED***
IntelliChem Auto
__Setup Wizard__
Press MENU to go
to each new step
Awaiting
POWER&FLOW DELAY
H:00 M:14 S:18
please wait...
pH
OK
7.5
ORP OK
450
INTELLICHEM
Controller Installation and User's Guide
®
Controller System Power Up Sequence
Power-up Sequence: During power-up the IntelliChem
Controller displays the initialization screens before the
main status screen is displayed. During this initial power up
sequence, the IntelliChem controller performs an internal self
test and continues with a system calibration. The first screen
includes the current software version and date.
AUTO CALIBRATION is displayed each time IntelliChem is
powered up.
In the next auto-calibration sequence the pH and ORP meters
are tested with on-board circuitry and calibrated to the built-in
OK
reference devices. An out-of-tolerance condition is immediately
OK
reported as an error so the user can have the unit serviced.
The very first time IntelliChem controller is powered up and
after a factory reset, the Auto Setup Wizard start screen is
displayed. Otherwise access the wizard from the main menu
(see page 6).
The normal start up screen will simply be this one, awaiting
Power On & Flow Delay. The countdown timer shows the
remaining time before the unit starts reading the probes and
controlling the doser.
Main Status Screen: After IntelliChem controller has
completed the Flow Delay the main status screen displays the
measurements of the connected pH and ORP sensors.
®

Advertisement

Table of Contents
loading

Table of Contents