6.16 Installing the guard plate

Prerequisites
The storage system is positioned in its final
installation location.
Procedure
1. Overlap the two halves of the guard plate
2. Join the two halves of the guard plate together
with one positioner (1) and one screw (2)
(2)
6.37:
Join the guard plate together with one positioner
(1) and one screw (2)
3. Slide the guard plate under the storage system so
that the screw on the guard plate is at the front
and pointing upwards.
6.38:
Slide the guard plate under the storage system