Checking The Internet Connection; Setting Time And Date - Bosch BPT-S 5 Hybrid Installation Manual

Solar inverter with integrated battery
Hide thumbs Also See for BPT-S 5 Hybrid:
Table of Contents

Advertisement

Available languages

Available languages

116 | Commissioning
Storage system | Installation manual
8.5

Checking the Internet connection

Prerequisites
The Internet connection window is open.
Procedure
1. Checking the Internet connection
2. Press Next
8.5:
The Internet connection window
The Internet connection has been checked.
8.6

Setting time and date

The date and time can be synchronised automatically
via the Internet or set manually.
Info
If the storage system is connected to the Internet, we
recommend that you leave the automatic
synchronisation activated so that the storage system
always has access to the current time and date.
English
Bosch Power Tec GmbH

Advertisement

Table of Contents
loading

Table of Contents