Delivery And Positioning; Delivery; Transporting To The Installation Location (Haulage Contractor) - Bosch BPT-S 5 Hybrid Installation Manual

Solar inverter with integrated battery
Hide thumbs Also See for BPT-S 5 Hybrid:
Table of Contents

Advertisement

Available languages

Available languages

English
WARNING
Bosch Power Tec GmbH
5

Delivery and positioning

5.1

Delivery

The storage system is delivered partly pre-assembled
on a pallet together with two other packages:
One pallet with the battery converter and string
inverter
One pallet with the storage system (housing),
including one accessory kit containing, for example,
cables, plugs and screws
One pallet with the battery modules and a battery
management system
5.2
Transporting to the installation
location (haulage contractor)
Procedure
The storage system is delivered partly pre-assembled.
Risk of injury due to heavy weight
The heavy weight of the components may cause injury
during installation, disassembly and transport.
Transport and mount the components with two
people
Before transporting the device to the installation
location, remove the housing
Delivery and positioning | 51
Storage system | Installation manual

Advertisement

Table of Contents
loading

Table of Contents