Checking The Main Earthing - Bosch BPT-S 5 Hybrid Installation Manual

Solar inverter with integrated battery
Hide thumbs Also See for BPT-S 5 Hybrid:
Table of Contents

Advertisement

Available languages

Available languages

110 | External cabling
Storage system | Installation manual
2. Use the 8 mm spanner to secure the earthing cable
to the shielding plate with an M5 hex nut and a
washer (at the point with the earthing sign)
(tightening torque 2.7 Nm max.)
3. Use the 3 mm Allen key to secure the shielding
plate with four M5 rounded head screws and
washers (tightening torque 2.7 Nm)
The shielding plate is installed.
7.5

Checking the main earthing

Procedure
1. Check that the main earthing has been fitted in the
door channel at the factory (2W24 cable).
2. Check that the earthed door has been earthed with
an earthing cable in the factory.
The main earthing has been checked.
English
Bosch Power Tec GmbH

Advertisement

Table of Contents
loading

Table of Contents