Bosch BPT-S 5 Hybrid Installation Manual page 185

Solar inverter with integrated battery
Hide thumbs Also See for BPT-S 5 Hybrid:
Table of Contents

Advertisement

Available languages

Available languages

English
Bosch Power Tec GmbH
coordinates the communication between the
components in the storage system
logs the recorded measured values
makes data available for the portal
On the display of the EMS
all data concerning power consumption, yield, and
the status of the battery and other components is
displayed in real-time
you can make changes to network-specific settings
and system settings.
EMS start window
Touch the "menu" symbol on the EMS start window to
call up the different menus and sub-menus. During
commissioning, you are directed by a commissioning
wizard (see "Commissioning" chapter). After
successfully commissioning the device, the start
window of the storage system opens. Please refer to
the separate instruction manual for information on
how to adjust further settings in the storage system
or how to query data.
3.8:
EMS start window
Technical description | 41
Storage system | Installation manual

Advertisement

Table of Contents
loading

Table of Contents