Bosch Power Tec GmbH
11 Decommissioning
Risk of electric shock
The device's voltage supply comes from various
sources.
Follow the sequence for switching off the system
described in the instruction manual
Switch off the energy supply from the PV system
(external DC isolator)
Observe the 13-minute time period until the device
is fully de-energised
Data loss caused by switching the system off
incorrectly
If you do not follow the sequence for switching off
the system as described in the instruction manual,
system data and settings may be lost.
Always shut down the storage system first via the
EMS system menu
Only press the On/Off switch after the system has
shut down completely.
▶
Procedure
1. EMS start window: Press System shutdown
The System shutdown window opens.
Decommissioning | 129
Storage system | Installation manual