Stud Walls - Installation; Prestige Solo 80/110/155/175/250; Prestige Solo 299/399; Wall Bracket Installation - Solid Walls - Prestige Solo 110 Installation And Maintenance Manual

Table of Contents

Advertisement

3.0
Unit Preparations
3.4

Stud Walls - Installation

3.4.1 PRESTIGE Solo 80/110/155/175/250

1. Locate the studs in the general area of the
boiler placement.
2. Place the wall-mounting bracket on the
wall centering the mounting slots with the
stud centers and ensuring the upper edge of
the bracket is away from the wall.
3. Level the bracket, while maintaining it's
centering with the studs and use a pencil to
mark the location of the mounting slots.
4. Remove the bracket from the wall and drill
1/4" diameter hole by 3" deep positioned in
the center of each mark. For applications
using metal studs and 3/16" toggle bolts,
drill the required clearance hole.
5. Reposition the bracket onto the wall and
align mounting slots/holes. Insert the two
lag screws provided (or toggle bolts for
metal studs) through the mounting
slots/holes and loosely tighten.
6. Level bracket and tighten screws (bolts for
metal studs) securely making sure not to
over-tighten to avoid damaging drywall or
plaster.

3.4.2 PRESTIGE Solo 299/399

1. To distribute the weight of the boiler even-
ly when mounting onto a stud wall it is rec-
ommended to use the PRESTIGE Solo
Wall Frame kit.
2. When using the wall frame to mount the
boiler reference the kit installation instruc-
tions and ensure the frame is securely fas-
tened to the wall.
3. If the structure of the wall is questionable
in supporting a minimum weight of 265
pounds [120 kg.], it is recommended to use
the optional floor stand.
3.5
Wall Bracket Installation - Solid
Walls
1. Locate the general area of the boiler place-
ment.
2. Place the wall-mounting bracket on the
wall ensuring the upper edge of the bracket
is away from the wall.
3. Level the bracket and use a pencil to mark
the location of the mounting slots on the
wall.
4. Remove the bracket from the wall and drill
a 5/8" diameter hole by 1-3/8" deep posi-
tioned in the center of each mark.
5. Install the anchors (provided)
slightly recessed in the drilled holes with
threaded side facing down.
6. Reposition the bracket on the wall and
align mounting slots/holes. Insert the two
bolts (provided) through the mounting
slots/holes and loosely tighten.
7. Level bracket and tighten bolts securely.
3.6

Boiler Mounting

1. Obtain assistance in lifting the boiler onto
the wall bracket.
2. Install the boiler making sure the boiler
mounting lip located along the upper edge
of the rear jacket panel engages the wall-
mounting bracket.
seated properly and is secure.
13
flush or
Ensure the boiler is

Advertisement

Table of Contents
loading

This manual is also suitable for:

Solo 80Solo 250Solo 299Solo 399Solo 155Solo 175

Table of Contents