ParaBody 426103 Manual page 42

Elastic cord conversion kit
Table of Contents

Advertisement

TOP BOOM
5
4
LEG EXT
CABLE
LEG PRESS CABLE
LAT CABLE
FIGURE 16
STEP 16
• Assemble the 72" ELASTIC CORD (4) from the LAT CABLE around the 2" PULLEY (5) in the TOP BOOM as shown in FIGURE 16.
42

Advertisement

Table of Contents
loading

This manual is also suitable for:

Serious steel 426103

Table of Contents