Applying Power To The Cvx 600; Procedure - Nortel CVX 600 Hardware Installation Manual

Multi-service access switch
Table of Contents

Advertisement

CVX 600 Hardware Installation Guide

Applying Power to the CVX 600

Applying Power to the CVX 600

Procedure

To apply power to the CVX 600, follow these steps:
Step
1
2
3
4
5
6
2-42
Action
Ensure that you have connected all power cables to the appropriate terminals.
Ensure that you have installed the clear protective cover over the power cable
terminals.
Ensure that you have inserted the flash memory card in PCMCIA slot 1 on the
SCC (the upper SCC, if using master and redundant SCCs).
Ensure that both switches on the circuit breakers (PDUs) are off.
Circuit breaker (PDU) switches
Fan s
PD U
1
BIP
1
2
3
4
5
6
Apply power from the power source.
Ensure that the red LEDs on both PDUs are on. If they are, turn the switches
on both circuit breakers (PDUs) on. If the LEDs are not on, check all power
connections.
BIP
C VX
6o o
PD U
2
ES D
Jac k
296-1011-202 Rel. 5.0, Doc. Rev. 02.01
CVX-0202B

Advertisement

Table of Contents
loading

Table of Contents