Copyright © 2006 Nortel Networks
•
•
Setting up rack to mount hardware
Procedure 1 Setting up rack to mount hardware
At the rack,
1
MCS 2-server Sun Fire V100 Solaris Installation and Commissioning Guide
Media Application Server: 1 IBM x336 (2 3.6 GHz Xeon, 1-GB RAM,
1 73-GB SCSI drive, Windows 2000)
Multimedia PC Clients
Make sure you have
•
Business Policy Switch 2000 (BPS 2000) or Layer-2 switch
•
vendor documentation for configuring your Layer-2 switch
•
one (1) additional cat-5 ethernet cable to connect the MRV LX
terminal server to the layer-2 switch
•
a pc for the System Management Console, and access to the
network
WARNING
Static electricity could be harmful to the servers.
Mount all equipment. Refer to the following diagram that displays
the mounting for the rack.
•
Mount Layer-2 switch.
•
Mount the MRV LX terminal server.
•
Mount Sun Fire V100s.
— Database/Management/Accounting server
— Application server
•
(optional equipment) Mount conference server. Refer to the
Media Application Server documentation for more
information.
•
(optional equipment) Mount gateway. Refer to
customer-specific gateway installation documentation.
Note: All MCS equipment is 19-inch rack mountable.
27
ATTENTION