Bottom cover
Batery lid hinge cover
(#807)
#807)
Bottom cover
(#27)
・ Tighten the two screws (#1528) in the order from ① to ② .
・ Tighten the two screws (#1529) in the order from ③ to ④ .
・ Tighten the three screws (#1517) in the order from ⑤ to ⑦ .
③
Screw (#1529)×2
Screw (#1571)×2
Screw (#1519)×4
④
①
- A122 ・ D700 -
Hinge mold (#806)
Tripod base (#25)
Sponge (#981)
⑤
⑥
Screw (#1528)×2
INC
VBA22001-R.3754.A
Apply to all sponges.
Oil barrier:OS-30MEL
Sponge (#983)
Sponge (#989)
Sponge (#982)
Sponge (#984)×2
Screw (#1517)×3
⑦
②