Bcm50 Upgrade Flow Charts; Upgrading From Bcm50 Rls 1.0 To Rls. 6.0 - Avaya BCM50 Hardware Installation Manual

Hide thumbs Also See for BCM50:
Table of Contents

Advertisement

BCM50 Upgrade Flow Charts

Please read and follow the below processes to ensure that the correct steps
are performed for your particular upgrade.

Upgrading from BCM50 Rls 1.0 to Rls. 6.0

Create a Backup of the Rls 1.0 software: refer to the Backup &
Restore Guide.
Obtain a Keycode file with Rls 3.0 and Rls 6.0 upgrade entitlements,
and also the Rls 3.0 and Rls 6.0 Upgrade Files and Factory Images:
refer to the Pre-Upgrade Activities section of this guide.
Ensure the Time Zone is not set to Factory Default: refer to the
Checking the Time Zone is Set Correctly section of this guide.
Ensure the DHCP Setting is not set to Enabled-Automatic: refer to the
Checking the DHCP Server Setting section of this guide.
Apply the Keycode File containing the Rls 3.0 and Rls 6.0 upgrade
entitlements: refer to the Applying the Keycode File section of this
guide.
Perform the Rls 1.0 to Rls 3.0 upgrade: refer to the Performing the
Upgrade section of this guide.
Apply the Rls 3.0 Factory Image: refer to the Applying the Factory
Image section of this guide.
Create a backup of the Rls 3.0 software: refer to the Backup &
Restore Guide.
Perform the Rls 3.0 to Rls 6.0 upgrade: refer to the Performing the
Upgrade section of this guide.
Apply the Rls 6.0 Factory Image: refer to the Applying the Factory
Image section of this guide.
Perform any required post-upgrade activities: refer to the Post-
Upgrade Activities section of this guide.
NN40011-002 Issue 1.2 BCM50 Rls 6.0
BCM50 Hardware & Installation
73

Advertisement

Table of Contents
loading

Table of Contents