Removal Of Electrical Box / Pcbs - Daikin FLXS-BAVMB Service Manual

Floor / ceiling suspended dual type ba-series
Hide thumbs Also See for FLXS-BAVMB:
Table of Contents

Advertisement

SiBE05-722_B
1.7

Removal of Electrical Box / PCBs

Procedure
Step
1. Remove the PCBs.
1
Disconnect the earth
wire and pull out the
indoor heat exchanger
thermistor.
2
Disconnect the 2 relay
harnesses at the rear
side of the fan motor.
3
Remove the electrical
box cover.
(Unfasten the 2 hooks.)
Removal Procedure
Warning
Be sure to wait for 10 minutes or more after turning off all power
supplies before disassembling work.
Procedure
Earth
Fan motor
Points
Indoor heat exchanger thermistor
Clamp the harnesses and
wires with clips as they were
when reassembling.
Negligence of above
procedure may result in
catching wire with the front
panel and may cause
malfunction.
(R3007)
Hook
Electrical box cover
(R3008)
Indoor Unit
(R3006)
126

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents