Removal Of Electrical Box - Daikin RZQ71~125B7V3B Service Manual

Sky-air inverter r-410a b series
Table of Contents

Advertisement

ESIE04-01

2.11.4 Removal of Electrical Box

Warning
Be sure to wait 10 minutes or more after turning off all power supplies before disassembling work.
Procedure:
Step
Removing the front grille in
accordance with "Removal
of Front Grille".
1
Remove the screw on the
service cover.
2
Remove the screw on the
drip proof plate.
3
Remove the screw for the
grounding wire.
4
Remove the following
connectors.
Fan motor connector
Air swing motor
connector
5
Pull the heat exchanger
thermistor and dismantle
it.
6
Remove the fixing screw
for switch box.
7
Pull forward the switch
box holding lower part of
the box.
Part 5 – Disassembly and Maintenance
Procedure
Disassembly and Maintenance: Indoor Units
Points
1
3
5
5
5–105

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents