Preparing For Use; Unpacking And Checking The Delivery; Steps For Initial Setup - Fujitsu Siemens Computers PRIMERGY Econel 50 Operating Manual

Hide thumbs Also See for PRIMERGY Econel 50:
Table of Contents

Advertisement

Preparing for use

CAUTION!
!
Please take note of the safety information in the "Important notes" chapter.

Unpacking and checking the delivery

It is recommended not to throw away the original packaging material! It may be required for
reshipment at some later date.
Ê
Unpack all the individual parts.
Ê
Check the delivery for damage incurred during transportation.
Ê
Check whether the delivery agrees with the details in the delivery note.
Should you discover that the delivery does not correspond to the delivery note, notify your local sales
outlet immediately.

Steps for initial setup

Only a few steps are necessary to put your new server into operation for the first time:
Select location for server and set up server
Connect the monitor, mouse and keyboard
Check the voltage at the mains outlet and connect the server to an electrical outlet. Switch
the server on
You will learn more about the individual steps in the following sections
External devices
i
If you have received other devices in addition to your server (e.g. a printer or a modem),
do not connect these until after the initial installation. The following sections contain a
description of how to connect these external devices: "Connecting external devices to the
serial port", "Connecting external devices to the parallel port" and "Connecting external
devices to the USB ports".
Drives and boards
If you have received additional drives or boards with your server, please do not install
them until after first-time setup. How to install drives and boards is described in the
"Options Guide" manual.
A26361-K831-Z502-1-7619
7

Advertisement

Table of Contents
loading

Table of Contents