Preparing For Use; Unpacking And Checking The Delivery; Steps For Initial Setup - Fujitsu Siemens Computers PRIMERGY ECONEL 10 Operating Manual

Table of Contents

Advertisement

Preparing for use

Please take note of the safety information in the chapter
!

Unpacking and checking the delivery

It is recommended not to throw away the original packaging material! It may be required for
reshipment at some later date.
Ê
Unpack all the individual parts.
Ê
Check the delivery for damage incurred during transportation.
Ê
Check whether the delivery agrees with the details in the delivery note.
Should you discover that the delivery does not correspond to the delivery note, notify your local
sales outlet immediately.

Steps for initial setup

First-time setup includes the connection of the monitor, mouse and keyboard to the system unit and
the setup of the supplied software.
External devices
i
If you have received other devices in addition to your PC (e.g. a printer or a modem), do
not connect these until after the initial installation. The following sections contain a
description of how to connect these external devices:
serial
port" and
Drives and boards
If you have received drives or boards with your PC, please do not install them until after
first-time setup. How to install drives and boards is described in the chapter
expansions".
Perform the following steps in the prescribed order:
1.
Decide where you are going to use the PC and set up the PC.
2.
Connect the monitor, mouse and keyboard to the PC.
3.
Check the rated voltage of the PC and connect it to line voltage.
4.
Switch the PC on and follow the instructions on the screen.
A26361-K831-Z100-1-7619
"Connecting external devices to the parallel
"Important
notes".
"Connecting external devices to the
port".
"System
7

Advertisement

Table of Contents
loading

Table of Contents