Blank Front Panels - Extreme Networks BlackDiamond 8800 Hardware Install Manual

Hide thumbs Also See for BlackDiamond 8800:
Table of Contents

Advertisement

3 Squeeze the release latch on each injector/ejector handle and rotate both handles outward to
disconnect the module from the chassis backplane
Caution
To prevent ESD damage, hold the module by the metal panel edges only. Never touch the
components on the PCB or the pins on any of the connectors.
Figure 69: Indications that the Module is Unlocked
4 Slide the module out of the chassis slot.
5 Immediately place the module into the anti-static bag to protect it from potential ESD damage. The
bag will also prevent dust from collecting on the module connectors.
6 If you are not going to install a replacement module, install a blank front panel. To install a
replacement module, follow the installation procedure starting with step
Note
Leave the ESD-preventive wrist strap permanently connected to the chassis so that it is
always available when you need to touch ESD-sensitive components.

Blank Front Panels

BlackDiamond switches are shipped with blank front panels installed over one or more chassis slots. You
can remove or install a blank front panel at any time without disrupting network services. Complete the
action of installing a blank front panel in a reasonable time-frame to avoid disruption to adequate
airflow.
Caution
All unoccupied slots in a BlackDiamond 8800 Series switch must have blank front panels
correctly installed to ensure conformance to FCC requirements as well as to maintain
adequate airflow through the switch.
You need the following tools and equipment to install or remove a blank front panel:
ESD-preventive wrist strap
#2 Phillips screwdriver
Installing a Blank Front Panel
To install the blank front panel:
BlackDiamond 8800 Hardware Install Guide
Installing Modules and Establishing Initial Management Access
(see the following
figure).
4
on page 91.
97

Advertisement

Table of Contents
loading

Table of Contents