Construction Views - Toshiba RAS-18, 22SKV-E Service Manual

Hide thumbs Also See for RAS-18, 22SKV-E:
Table of Contents

Advertisement

4-1. Indoor Unit
RAS-18SKVR-E, RAS-22SKVR-E
RAS-18SKVR-A, RAS-22SKVR-A
Front panel
50
Knock out system
Installation plate hanger
Connecting plate (0.39m)
(For 18, 22 series; Flare Ø12.70mm)

4. CONSTRUCTION VIEWS

1050
Air filter
Air inlet
Heat exchanger
Installation plate hanger
132
568
132
235
215
Hanger
85
Hanger
47
215.5
262.5
Center line
Plasma air purifier
Air ionizer
72
200
150
Connecting pipe (0.49m)
Drain hose
(Flare Ø6.35mm)
(0.5mm)
786
132
235
215
Hanger
262.5
153.5 109
Instrallation plate outline
– 20 –
FILE NO. SVM-10050
228
50
Knock out system
78
56
Wireless remote controller
63
Remote controller holder
23
19
26

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents