Start-Up; Preliminary Checks; Actual Start-Up; Operation Of Two Units In Master/Slave Mode - Carrier 30RQ 039 Series Installation, Operation And Maintenance Instructions

Reversible air-to-water heat pumps
Table of Contents

Advertisement

14 - STaRT-Up

14.1 - preliminary checks

Never be tempted to start the heat pump without reading
fully, and understanding, the operating instructions and
without having carried out the following pre-start checks:
Check the chilled water circulation pumps, air handling
units and all other equipment connected to the evapo-
rator.
Refer to the manufacturer's instructions.
For units without hydronic module, the water pump
overheat protection device must be connected in series
with the pump contactor power supply.
Refer to the wiring diagram supplied with the unit.
Ensure that there are no refrigerant leaks.
Confirm that all pipe securing bands are tight.
Confirm the the electrical connections are secure.

14.2 - actual start-up

ImpOrTANT:
Commissioning and start-up of the heat pump must
be supervised by a qualified refrigeration engineer.
start-up and operating tests must be carried out with
a thermal load applied and water circulating in the
water heat exchanger.
All set point adjustments and control tests must be
carried out before the unit is started up.
please refer to the 30rB/30rQ 017-160 pro-Dialog+
control manual.
The unit should be started up in Local ON mode.
Ensure that all safety devices are operational, especially
that the high pressure switches are switched on and that
the alarms are acknowledged.

14.3 - Operation of two units in master/slave mode

The control of a master/slave assembly is in the entering
water and does not require any additional sensors (standard
configuration). It can also be located in the leaving water.
In this case two additional sensors must be added on the
common piping.
All parameters, required for the master/slave function must
be configured using the Service Configuration menu. All
remote controls of the master/slave assembly (start/stop,
set point, load shedding, etc.) are controlled by the unit con-
figured as master and must only be applied to the master
unit.
Depending on the installation and control type, each unit can
control its own water pump. If there is only one common
pump for the two units, the master unit can control this. In
this case shut-off valves must be installed on each unit. They
will be activated at the opening and closing by the control
of each unit (and the valves will be controlled using the
dedicated water pump outputs).
Standard configuration: return water control
Configuration: leaving water control
legend
1
Master unit
2
Slave unit
Additional CCN board (one per unit, with connection via communication bus)
Control boxes of the master and slave units
Water inlet
Water outlet
Water pumps for each unit (included as standard for units with hydronic
module)
Additional sensors for leaving water control, to be connected to channel 1
T
of the slave boards of each master and slave unit
CCN communication bus
Connection of two additional sensors
Check valve
35

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

30rq 160 series30rqy 039 series30rqy 160 series

Table of Contents