Electrical Connections - Biasi GARDA HE SYSTEM M96.28SR/P User Manual And Installation Instructions

Wall hung, fan flue, room sealed, high efficiency gas boiler
Hide thumbs Also See for GARDA HE SYSTEM M96.28SR/P:
Table of Contents

Advertisement

Installation
For M96.32SR/...
Equivalent length
(air duct + flue duct)
Between 1 and 24 m
Tab. 6.2
Vertical--- roof kit (Fig. 6.9)
This kit allows vertical termination of the flue pipe
through the roof. The kit is 1.2 m in length. Exten-
sion pieces (Co--- axial) are also available which al-
lows the flue system to be extended to a total
overall maximum permissible length.
Optional 45û and 90û elbows can be used to offset
the flue route.
Each additional elbow reduces the overall accept-
able length of the flue system as follows:
45û reduce length by 0,5 m.
90û reduce length by 1 m.
max =8,5 m
Only for M96.32SR/...
max = 6 m
max = 8.5 m
Fig. 6.9
24
6.9
Restrictor
Connection to the electricity supply
1 Remove the front panel of the case (see the
ø 50 mm
2 Remove the screws F and G (Fig. 6.10).
3 Loosen the screws H.
G
90û=--- 1 m
45û=--- 0,5 m
90û=--- 1 m
45û=--- 0,5 m
Fig. 6.10
4 Remove the side panels or move the lower part

Electrical connections

section 9.2 in this manual).
F
H
G
H
of the side panels as indicated in Fig. 6.11 and
pull the control panel.
When completely pulled out, the panel can ro-
F
H
F
G

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents