Biasi GARDA HE SYSTEM M96.28SR/P User Manual And Installation Instructions page 29

Wall hung, fan flue, room sealed, high efficiency gas boiler
Hide thumbs Also See for GARDA HE SYSTEM M96.28SR/P:
Table of Contents

Advertisement

Installation
tate 45û downwards to facilitate the operations
on the internal parts.
Fig. 6.11
5 Loosen the screws I and remove the service
panel (Fig. 6.12).
I
I
Fig. 6.12
For the electrical connection to the boiler use elec-
tric wires which conform to the current regulations,
with flexible cord, each core having a cross sec-
tion area not less than 0,75 mm
6 Connect the electrical supply flexible cord
coming from the fused spur isolation switch to
the power supply terminal block of the boiler
(Fig. 6.13) keeping the same connections for
the live (brown wire) and the neutral (blue
wire). External 3 A fuse or fused plug with same
current rating is recommended.
Do not connect live wires to terminals to
which the room thermostat must be con-
nected.
7 Connect the earth wire (yellow/green).
Connection of a room thermostat
The room thermostat must be connected to the
terminal block situated next to the control panel.
When connecting any type of external control,
the link J in Fig. 6.13 must be removed.
2
.
25

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents