9.

Commissioning the machine

02
Fig. 9 - 02
Clean the machine thoroughly, checking the electrical cables and pneumatic connecting
hoses for any damage.
Oil machine and/or fill with oil (see chapter 12 Care and maintenance).
Have specialists ensure that the machine's motor can be operated with the available
electricity supply and that it is connected correctly to the power supply. If not, the
machine must not be operated.
Connect the machine to the compressed air system. The pressure gauge on the air
lubricator 2 must indicate a pressure of 6 bar. If necessary, set the gauge to this value
(see chapter 12.07.01 Checking and regulating air compression).
Mounting and commissioning the machine
AUS
1
EIN
Überw.
Bügel
S 98.1
The safety switch 1 in the control box must be turned on before commissioning
the machine! The machine must not be operated when the safety switch 1 is
turned off! Danger of injury!
The machine can be operated either with or without lubricated air.
For operation without lubricated air, the oil bowl in the air lubricator 2 must
remain empty.
Machines which have been operated once with lubricated air must always be
supplied with lubricated air!