Mounting And Commissioning The Machine; Mounting - Pfaff 3568-12/22 Instruction Manual

Table of Contents

Advertisement

Mounting and commissioning the machine

9
Mounting and commissioning the machine
After unpacking the machine, check it for any transport damage. In case of damage, inform
the shipping company and the responsible PFAFF dealer.
9

Mounting

.01
Suitable connections for supplying electricity and compressed air must be available at the
machine's location (refer to chapter 3 Specifications).
The location where the machine is set up must have a flat, sturdy surface.
9 - 1
The machine must only be mounted and commissioned by qualified personnel!
All relevant safety regulations are to be observed!
Fig. 9 - 01
Lift the machine with a forklift from the shipping pallet.
Screw the six enclosed rubber springs onto the legs.
Set down the machine on the ground and make sure it is standing horizontally by pushing
the legs.
Attach stacker frame and align.
Plug disk drive into socket 2.
2
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents