Empire Comfort Systems DVCP36BP0N-2 Installation Instructions And Owner's Manual page 28

Direct vent zero clearance gas fireplace heater millivolt and intermittent pilot series
Table of Contents

Advertisement

FRAMING AND FINISHING (continued)
Vertical Firestops
Vertical runs of this system which pass through ceilings require
the use of ONE ceiling firestop at the hole in each ceiling through
which the vent passes.
Position a plumb bob directly over the center of the vertical vent
component and mark the ceiling to establish the center point of the
vent. Drill a hole or drive a nail through this center point and check
the floor above for any obstructions such as wiring or plumbing
runs. Reposition the appliance and vent system, if necessary, to
accommodate ceiling joists and/or obstructions.
Cut a 10 inch x 10 inch hole through the ceiling, using the center
point previously marked. Frame the hole with framing lumber the
same size as the ceiling joists. See Figure 54. If the area above the
ceiling is NOT an attic, position and secure the ceiling firestop on
the ceiling side of the previously cut and framed hole. See Figure
55. If the area above the ceiling is an attic, position and secure the
firestop on top of the previously framed hole. See Figure 56.
NOTE: Remove insulation from the framed area in the attic before
installing the firestop and/or vent pipes.
EXISTING CEILING JOISTS
CEILING
Page 28
NEW FRAMING
10"
(254mm)
10"
(254mm)
Figure 54
NAILS OR SCREWS
(4 REQUIRED)
Figure 55
See Vertical Termination Pages 30 - 31.
Figure 56
35919-4-1015

Advertisement

Table of Contents
loading

Table of Contents