Masonry Installation - Travis Industries 36 ELITE-BI Xtrordinair Installation Manual

Hide thumbs Also See for 36 ELITE-BI Xtrordinair:
Table of Contents

Advertisement

Masonry Installation

This section is a step-by-step overview on how to construct a masonry installation. It is for review only
and is not the only method of installation. Because of the vast difference between masonry installations,
this section will be handled in a generalized format. Carefully plan the installation prior to starting.
!
This installation should only be performed by a qualified mason familiar with constructing fireplaces
and the codes and requirements that apply.
!
Read this entire manual before installing the fireplace.
!
Failure to install this fireplace
in accordance with all local
codes and the requirements
listed in this manual may
result in property damage,
bodily injury, or even death.
!
Notify your insurance
company before installing this
fireplace.
Step #1 - Concrete Footing.
A concrete footing should be
made following all
specifications that apply.
Foundation depth as required
by local Bldg. Code, min. 12"
thick and 6" beyond walls of
fireplace.
Step #2 - Concrete Block
Foundation.
The concrete foundation is
used support the weight of the
masonry column around the
fireplace. See the illustration
on page 8 for a cross section.
U.B.C. requires 8" side wall
and 8" rear wall. Where Bldg.
Codes permit, a 4" masonry
wall is sufficient.
M
I
ASONRY
NSTALLATION
(C
)
ONTINUED
P
27
AGE

Advertisement

Table of Contents
loading

Table of Contents