Field Service Ver. 1.0 Apr. 2008
[1]
[2]
[1]
12. To reinstall, reverse the order of removal.
13. From the Menu, select [SERVICE MENU] → [SUPPLIES] → [REPLACE] → [TRANS.
BELT] and execute this function to reset the transfer belt counter value.
See P.189
14. From the Menu, select [QUALITY MENU] → [CALIBRATION] → [AIDC PROCESS] and
execute this function.
See P.140
A011F2C530DA
A011F2C531DA
[1]
A011F2C532DA
3. Periodical check
9. Grasp the transfer belt handle and
pull the transfer belt [1] out.
10. Remove the packing material from
the new transfer belt.
NOTE
• Use care not to touch the belt of the
transfer belt.
11. Insert the transfer belt [2] along the
rails [1].
NOTE
• When inserting the unit, use care
not to allow the docking gear to hit
against the rail or other mechanism
to prevent damage.
23