Ceramic-Radiant Burner - Vulcan-Hart VBB1F Service Manual

V-series heavy duty broilers, double deck and range match models
Table of Contents

Advertisement

V-SERIES HEAVY DUTY BROILERS, DOUBLE DECK AND RANGE MATCH MODELS - REMOVAL AND
Fig. 11
4.
Reverse procedure to install and check for proper
operation.

CERAMIC-RADIANT BURNER

Shut off the gas before servicing the
unit.
1.
Remove MANIFOLD COVER.
2.
Remove CONTROL VALVE COVER next to rack
lift assembly handle.
3.
Adjust rack assembly to the lowest position to
access the burners.
Ceramic bricks can easily be damaged.
Use care when handling.
4.
Lift ceramic bricks [1] Fig. 12 off the support rails
[2] Fig. 12 for each burner [3] Fig. 12. There are
6 ceramic bricks for each of the 3 burners (18
bricks total).
F45548 (0715)
REPLACEMENT OF PARTS
5.
Remove screws securing pilot tube mounting
brackets [1] Fig. 13 to burner support [2] Fig.
13. Position pilot tube assemblies out of the way
to the sides.
6.
Remove screws securing manifold bracket [1]
Fig. 14 to burner support [2] Fig. 14. Allow
bracket to drop down out of the way.
7.
Loosen screws [1] Fig. 15 (qty 6) by several turns
that secure the burner support [2] and brace [3]
Fig. 15 to broiler frame.
Page 8 of 16
Fig. 12
Fig. 13
Fig. 14

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents