IBM eServer 240 xSeries User Reference Manual page 99

Hide thumbs Also See for eServer 240 xSeries:
Table of Contents

Advertisement

2. Install the trim bezel, if it was removed.
1
Bezel-release lever
2
Trim bezel
3
Slots (hidden by bezel)
a. Place the tabs on the left side of the trim bezel in the slots 3 at the left
front of the server.
b. Press the right end of the bezel toward the server until the bezel clicks into
place.
3. If you disconnected any cables from the back of the server, reconnect the
cables; then, plug the power cords into properly grounded electrical outlets.
Note: If necessary, see "Input/output connectors and expansion slots" on
page 11 for connector locations.
4. Slide the server into the rack enclosure until the side latches click into place.
5. Restart your server.
6. Update device records and reconfigure your server (see "Updating device
records and reconfiguring the server" on page 90).
Chapter 4. Installing options
89

Advertisement

Table of Contents
loading

Table of Contents