Indoor Installation - American Dynamics SpeedDome Ultra 8 Installation And Service Manual

Hide thumbs Also See for SpeedDome Ultra 8:
Table of Contents

Advertisement

Indoor Installation

This section explains how to connect the housing
and eyeball assembly to a mounting base.
Items You Will Need
You should have on hand the following tools and
parts:
Install/Removal tool to attach and detach domes
and bubbles without a ladder.
Base kit: ADSDUIOB (black) or ADSDUIOBW
(white).
SpeedDome Ultra 8 housing and eyeball
assembly, 0101-0150-xx.
Other Preparations
To ensure a smooth and successful installation,
you must:
Have electrical work comply with latest national
electrical code, national fire code, and all
applicable local codes and ordinances.
Coordinate work with other trades to avoid
interference.
Verify existing site conditions and coordinate
with the owner's representative and appropriate
utilities as required.
Obtain copies of all related plans, specifications,
shop drawings and addenda to schedule and
coordinate related work.
Thoroughly review the project to ensure that all
work meets or exceeds the above requirements.
Bring alleged discrepancies to the attention of
the CCTV Project Coordinator.
Connecting to the Mounting Base
CAUTION:
The maximum length of
cable allowed between the Class 2 LPS
(low voltage) ac source, such as a J-box,
and the dome is 250m (820ft).
This procedure explains how to connect the cables
to the I/O board, check the cable connections, and
attach the I/O board to the dome's base. Once
done, attach the housing and eyeball assembly to
the base (refer to the instructions included with the
housing and eyeball assembly).
A .
Ensure that ac power and
W ARNING:
electrical signals are off during wire
connections!
SPEEDDOME ULTRA 8 CAMERA DOME
INSTALLATION AND SERVICE GUIDE
Referring to Figure 9:
1. Set the termination jumper E1 according to the
dome's position in the communications line.
Position of dome in
communications line...
Between other devices
End of communications line
You may need a small slotted screwdriver
Note:
to gently pry the jumper loose. Be careful not to
damage the PC board.
2. Connect video and set jumpers:
Coax: Connect to the I/O board BNC video
cable extension and leave video config.
jumpers E4 and E5 across pins 1 and 2
(default position). These pins are closest to
the video extension cable.
UTP: Connect to terminal block TB5 and
place video config. jumpers E4 and E5
across pins 2 and 3 (pins farthest to the
video extension cable).
TB5 UTP P in D e signa tio n s
Pin
Designation
1
Video Hi
2
Video Lo
3. Connect the Manchester, RS-422, or SensorNet
485 data wires to connector TB1. If using a
Pelco Coaxitron or Panasonic UTC protocol, no
data wires are connected, just power.
M anch ester data co n n e ctio n s.
Order data cable 88760 (plenum) or 8760 (non­
plenum) from Belden by calling 1-800-235-3361.
Pin
Color
1-4
5
Black
6
White
RS-422 data c o n n e ctio n s
Pin
Color
1
Orange
2
Green
3
Yellow
4
Brown
5-6
10 OF 30
Setting
Pins
Unterminated
Off
Terminated
1-2
Designation
Not used.
Manchester (+)
Manchester (-)
Designation
RS-422 Data In High (+)
RS-422 Data In Low (-)
RS-422 Data Out High (+)
RS-422 Data Out Low (-)
Not used.
8200-0600-03, REV. F1

Advertisement

Table of Contents
loading

Table of Contents