Loading Top Mount Adhesive; Loading Bottom Thermal Film - GBC Talon 44 CE Installation & Operation Manual

Hide thumbs Also See for Talon 44 CE:
Table of Contents

Advertisement

Operations Manual
Fig 26
©2004 General Binding Corporation
Fig 27

Loading Top Mount Adhesive

This procedure describes how to load a roll of mount adhe-
sive using the upper position for pre-coating (Figure 26).
1. Turn the Power ON/OFF to ON (I). If the laminator
is already hot, turn POWER ON/OFF to the OFF (O)
position and allow the unit to cool. Once cool, turn the
laminator back on.
2. Ensure no brake tension is applied to the film shaft.
3. Remove the safety shield.
4. Set the roll of mount adhesive in the upper rear unwind/
rewind position.
5. Pull the mount adhesive over the upper idler and upper
main roller allowing the material to rest on the top of
the feed table.
6. Reference THREADING CARD PROCEDURE next.

Loading Bottom Thermal Film

This procedure describes how to load a roll of thermal
film using the lower unwind position for encapsulation
(Figure 27).
1. At this point you should have an upper roll of thermal
film loaded onto the laminator.
2. Ensure no brake tension is applied to the film shaft.
3. Guide the bottom film around the lower idler.
4. Adhere the film to the loaded upper roll of thermal
film by pulling the film up towards the existing draped
thermal film over the main rollers.
NOTE: You may follow this procedure to load a roll of Kraft
Paper for single side lamination.
5. Reference THREADING CARD PROCEDURE next.
T
44/64
ALON
CE
Page 25

Advertisement

Table of Contents
loading

This manual is also suitable for:

Talon 64 ce

Table of Contents