INSTALLATION METHOD
INSTALLATION METHOD

Connection of Refrigerant Piping

Flare Processing
1. Cut the pipe using the pipe cutter.
2. Insert the flare nut into the pipe, and then perform the flare processing.
Pipe Bending
Tightening of Connection Parts
●Align the center of the connection piping, and tighten
the flare nut by turning it with hand. Then tighten it again
using the spanner in the direction as shown in the figure.
Tightening Torque
Outer Diameter
400kg cm(28 ft · lb)
Ø9.52mm(3/8" )
700kg cm(50 ft · lb)
Ø15.8mm(5/8" )
30
E-
90
A
Outer Diameter
Ø9.52mm(3/8" )
Ø15.8mm(5/8" )
1.Perform bending of the pipe using the bender which has
Spring
a specified bending radius.
2.Be sure to take full care to perform bending of the pipe
successfully at one time.
Bending and unbending the pipe more than twice makes
the bending work increasingly difficult.
3.You may use the spring inserted into the gas pipe instead
of the bender to bend the pipe.
4.When you bend the pipe using the spring, hold the pipe with both
hands to prevent any distortion, and secure a minimum bending
radius of more than 100mm (4inch)
Final Torque
37
37
450kg·cm(32 ft· lb)
64
64
37
37
750kg·cm(54 ft· lb)
64
64
Oblique
Roughness
A
1.8mm(7/100" )
2mm(8/100" )
Remarks
Burr
.