Step eight: bind up pipe
1. Bind up the connection pipe, power
cord and drain hose with the band.
Jfi'ndoor
and
'-_\
__
_
outdaar_ eor_\
/
gas .....
\
.......
-"
pipe
\\
,
liquid
pipe//
\',_b//and
see_
drain he
2. Reserve a certain length of drain
hose and power cord for installation
when binding them. When binding to
a certain degree, separate the indoor
power and then separate the drain
hose.
I
I
connection pipe
drain hose
band
indoor power cord
3. Bind them evenly.
4. The liquid pipe and gas pipe should
be bound separately at the end.
Step nine: hang the indoor unit
1. Put the bound pipes in the wall pipe and then make them pass through the wall
hole.
2. Hang the indoor unit on the wall-mounting frame.
3. Stuff the gap between pipes and wall hole with sealing gum.
4. Fix the wall pipe.
5.Check if the indoor unit is installed firmly and closed to the wall.
indoor
outdoor
wall
'_
p_pe
= sealing gum
-30-