Download Print this page

Carrier 40GRQ Owner's Manual page 26

Hide thumbs Also See for 40GRQ:

Advertisement

Step
one:
choosing
installation
location
Recommend the installation location to the client and then confirm it with the client.
Step two:
install
wall-mounting
frame
1. Hang the wall-mounting frame on the wall; adjust it in horizontal position with the
level meter and then point out the screw fixing holes on the wall.
2. Drill the screw fixing holes on the wall with impact drill (the specification of drill
head should be the same as the plastic expansion particle) and then fill the
plastic expansion particles in the holes.
3. Fix the wall-mounting frame on the wall with tapping screws (ST4.2X25TA) and
then check if the frame is firmly installed by pulling the frame. If the plastic
expansion particle is loose, please drill another fixing hole nearby.
m
m
m
_
W
m
_
_
m
m
m
_
_
m
m
m
_
m
m
m
_
m
m
m
_
Step three:
open
piping
hole
1. Choose the position of piping hole according to the direction of outlet pipe. The
position of piping hole should be a little lower than the wall-mounted
frame,
shown as below.
Wall
Wall
(Rear piping hole)
(Rear
piping hole)
2. Open a piping hole with the diameter of ¢ 2 1/6 in (55ram) or ¢ 2 3/4 in (70ram) on
the selected outlet pipe position.In order to drain smoothly, slant the piping hole on
the wall slightly downward to the outdoor slde wlth the gradLent of 5-10 °.
-26-

Advertisement

loading

This manual is also suitable for:

38grq