Calibrate The Ph Monitor - GE AKTA avant User Manual

Hide thumbs Also See for AKTA avant:
Table of Contents

Advertisement

7.7.1

Calibrate the pH monitor

Maintenance interval
Calibrate the pH monitor once a day, when the pH electrode has been replaced, or if the
ambient temperature has changed by more than 5°C.
Required material
Use two pH calibration buffers with a difference of at least one pH unit. Preferably use
a pH standard buffer, pH 4 or pH 7, as the first calibration point, and a pH standard buffer
close to the lowest or highest pH you need to measure as your second point. Allow the
buffers to equilibrate to ambient temperature before use.
Instruction
Follow the instructions to perform the calibration.
Step
1
ÄKTA avant User Manual 29035184 AE
CAUTION
pH electrode. Handle the pH electrode with care. The glass tip may
break and cause injury.
Action
Open the System Control module. On the System menu, click Calibration.
Result: The Calibration dialog box opens.
7 Maintenance
7.7 Calibration procedures
7.7.1 Calibrate the pH monitor
321

Advertisement

Table of Contents
loading

Table of Contents