Chaffoteaux & Maury Britony System II 80 Nat Installation And Operating Instructions Manual
Chaffoteaux & Maury Britony System II 80 Nat Installation And Operating Instructions Manual

Chaffoteaux & Maury Britony System II 80 Nat Installation And Operating Instructions Manual

Advertisement

SYSTEM BOILER
Central Heating
Fanned Flue system
Installation and Operating
instructions
Manufactures N°
200905815037.31
200905816037.31
These instructions Must Be Left With The Appliance.
Model Type
Britony System II 80 Nat
Britony System II 100 Nat
Gas Council N°
41 - 980 - 15
41 - 980 - 17
c

Advertisement

Table of Contents
loading

Summary of Contents for Chaffoteaux & Maury Britony System II 80 Nat

  • Page 1: Installation And Operating Instructions

    Installation and Operating instructions These instructions Must Be Left With The Appliance. Manufactures N° Model Type Gas Council N° 200905815037.31 Britony System II 80 Nat 41 - 980 - 15 200905816037.31 Britony System II 100 Nat 41 - 980 - 17...
  • Page 2: Customer Care

    These instructions are suitable for the following boilers : Britony System II 80 Britony System II 100 Do not forget the Logbook! Chaffoteaux & Maury supports Benchmark, the heating industry code to ensure the correct installation, commissioning and servicing of domestic central heating systems. To The Householder Make sure you have a completed Logbook for your boiler.
  • Page 3: Table Of Contents

    Contents Page Page CUSTOMER CARE ..........COMMISSIONING AND TESTING ..... Guarantee............Pre-commissioning ..........Statutory Requirements........Central Heating............ CONTENTS............Lighting the boiler ..........INTRODUCTION ..........Post Commissioning..........DESCRIPTION ............ Handing over to the Householder......Location of components ........SYSTEM GUIDANCE.......... TECHNICAL DATA..........Flushing and Water Treatment ......
  • Page 4: Description

    Description Location of components 1. - Air pressure switch 2. - Steel chassis complete with expansion vessel 3. - Main heat exchanger 4. - Combustion chamber 5. - Multi - gas burner assembly comprising ignition and ionisation electrodes 6. - Automatic air separator and automatic vent 7.
  • Page 5: Technical Data

    Technical data Britony System II Britony System II PROPANE L.P.G. G31 Appliance category Cat II Cat II 2H 3+ 2H 3+ Gas rate Heat input C/H Maximum in kW 28.7 34.6 Maximum in kg/h 2.00 2.42 Maximum in Btu/h 98000 117900 Maximum in ft 44.8...
  • Page 6: Dimensions

    Dimensions Outer case dimensions : - Width : 440 (minimum space required 450) - Height : All dimensions in mm - Depth : Minimum clearances : - Below casing 200 mm Safety valve - Both sides 5 mm - Front ( for servicing) 500 mm center line - Above casing 170 mm...
  • Page 7: Operation

    Operation Fig. 6 Central Heating Mode To be able to supply heating, the main switch 15 Fig. 6 must be turned fully clockwise to position. This will be confirmed by the green indicator light 18 Fig. 6. When there is a demand for heating (either from the room thermostat or the external programmer) and the boiler temperature control is calling for heat.
  • Page 8: Installation Requirements

    Installation requirements Location It may be necessary to protect the terminal with a guard. Reference The boiler can be installed on any suitable internal wall. Provision should be made to the Building Regulations for guidance. Suitable must be made to allow the correct routing of the flue and siting of the guards may be obtained from the following manufacturer: terminal to allow the safe and efficient removal of the flue products.
  • Page 9: Connecting The Boiler To The System

    Installing the boiler (continued) Fig. 9 Fig. 10 Place the boiler on the wall on the hanging bracket.after removing the pre-installation jig. If required, there is space for all piping to pass behind the boiler. Using fig. 11 for reference, connect the gas and water pipes and the valves to the base of the appliance using the tails provided.
  • Page 10: Making The Electrical Connections

    Installing the boiler (continued) Making the Electrical Connections Hinge down the electrical box to gain access to the electrical connections. Push in the tabs (P fig. 13) on either side of the boiler and pivot the box forward. Undo the two retaining screws, remove cover and remove cable clamp. (A fig. 13) Connect the live and neutral wires to the multipin plug leaving sufficient earth wire to connect to the earthing point.
  • Page 11: Commissioning And Testing

    Commissionning and testing Pre-commissioning Allow the boiler to heat system. Check the inlet gas pressure (working pressure) while the Ensure that the system has been adequately flushed. boiler is operating. (Refer to technical data) Purge gas supply of air and test for soundness. Check the operation of the boiler controls and safety Carry out final electrical tests to ensure the correct polarity devices.
  • Page 12: System Guidance

    System guidance System Controls The boiler is suitable for sealed systems only. The maximum working pressure for the appliance is 3 bar. All The boiler is electrically controlled and is suitable for most fittings and pipework connected to the appliance should be modern electronic time and temperature controls.
  • Page 13: User's Instructions

    User’s instructions Isolating Taps (fig. 21) Control panel (fig. 20) taps shown in Open position 15. - Two position Selector switch 30. CH Flow isolating valve PILOT 31. Gas service tap 33. CH Return isolating valve WINTER 34. Pressure relief valve 16.
  • Page 14: Notes

    Notes...
  • Page 15 Notes...
  • Page 16 This appliance is suitable for Natural gas or LPG. A gas conversion must be made by a competent person. Chaffoteaux & Maury are continuously improving their products and therefore reserve the right to change specifications without prior notice and accepts no liability for any errors or omission in the information contained in this document. Manufacturer: Chaffoteaux &...

This manual is also suitable for:

Britony system ii 100 nat

Table of Contents