Install Leveling Legs; Make Gas Connection - Kenmore 11075202310 Installation Instructions Manual

29" dryer
Table of Contents

Advertisement

Available languages

Available languages

iNSTALL LEVELING LEGS
Excessive Weight Hazard
Use two or more people to move and install dryer.
Failure to do so can result in back or other injury.
Prepare
dryer
for leveling
legs
To avoid
damaging
floor,
use a large
fiat
piece
of cardboard
from
dryer
carton;
place
under
entire
back
edge
of dryer.
Firmly
grasp
dryer
body
(not console
panel)
and gently
lay dryer
down
on
cardboard.
Screw in leveling
legs
MAKE GAS CONNECTION
1,
Connect gas supply
to dryer
Flared
rnale fitting
Non-flared
male fitting
Remove
red cap
from
gas pipe.
Using a wrench
to tighten,
connect
gas supply
to dryer.
Use pipe-joint
compound
on threads
of all non-
flared
male
fittings.
If flexible
metal
tubing
is used, be sure there
are
no kinks.
NOTE:
For LP gas connections,
you must use pipe-joint
compound
resistant
to action
of LP gas.
Do not use TEFLON ®t tape.
2.
Plan pipe fitting
connection
g ¸
Ao 3/8"
flexible
gas connector
Bo 3/8"
dryer
pipe
C
C. 3/8"
to 3/8"
pipe elbow
Do 3/8"
pipe-to-flare
adapter
fitting
A combination
of pipe
fittings
must be used to connect
dryer
to existing
gas line. A recommended
connection
is shown.
Your
connection
may
be different,
according
to supply
line type, size,
and
location.
Using
a wrench
and tape
measure,
screw
legs into
leg holes until
bottom
of foot
is approximately
1/2"
(13 mm) (to match
height
of
3.6 cu. ft. capacity
washer)
or 11/2'' (38 mm) (to match
height
of
3.8 cu. ft. capacity
washer)
from
bottom
of dryer.
Now
stand
the dryer
on its legs.
Slide
the dryer
until
it is close to its
final
location.
Leave enough
room
for electrical
connection
and to
connect
the exhaust
vent.
For mobile home use
Gas dryers
must be securely
fastened
to the floor.
Mobile
home installations
require
a Mobile
Home
Installation
Hold-
down
Kit. For ordering
information
please
see your
Use and Care
Guide.
3.
Open
shut=off
valve
Closed
Open
valve
Open
shut-off:
valve
in supply
line; valve
is open
when
handle
is
parallel
to gas pipe.
Then, test all connections
by brushing
on an
approved
noncorrosive
leak-detection
solution.
Bubbles
will show
a leak.
Correct
any
leaks found.
t®TEFLON is a registered trademark of E.L Dupont De Nemours and Company.
13

Advertisement

Table of Contents
loading

Table of Contents