Rules, directives, inspections
Inspections performed by Kränzle
- measurement of earth line resistance
- measurement of voltage and current
- inspection of tension consistency with +/- 1530 V
- pressure check of heating coil at 300 bar
- visual and functional check as per the inspection sheet provided
- exhaust fume analysis (see test strips provided)
Guidelines for liquid sprayers
The machine conforms with the "Guidelines for liquid sprayers". These
guidelines are issued by the organisation of trade associations and may be
obtained from Carl Heymann-Verlag KG, Luxemburger Str. 49, 50939 Köln.
These guidelines specify that this machine is to be inspected by qualified
personnel whenever necessary, but no less than once every 12 months.
These inspections must be recorded in the inspection log at the end of this
manual.
Pressure container and steam boiler directives
Kränzle high pressure cleaning equipment conforms to the pressure container
and steam boiler directive. No construction approval, notification of licence and
takeover inspection are required. The water capacity is less than 10l.
Duties of owner
The owner is to ensure that all safety-relevant components are in a serviceable
condition before the sprayer is used. (e.g., safety valves, hose and electric
cables, spray equipment etc).
Emission control legislation
With stationary installation, the emission levels of the machine must be checked
once a year by a qualified organisation or person according to German law.
The first inspection must be carried out four weeks after the machine is
commissioned. The owner is responsible for having the inspection performed.
20

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

12/15015/120Therm ca 11/130Therm ca 12/150

Table of Contents